Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Korea Institute of Ocean Science & Technology UD350 DVIA-UD350 Setup Result Report
2016 DVIA-UD350 setup report for Korea Institute of Ocean Science & Technology: ACTIVE-state VC-Class summary table (ship environment), excursion notes referencing three attachment groups, plus internal-program screenshots, vibration-environment plots, and floor time-axis graphs (Z/X/Y). Decorative DOCX title-block image (image1) omitted from publication.

Dongjin Semichem Incheon Hitachi SU8010 DVIA-MB1000 (MB1000 P21) vibration environment measurement — 2016-07-04
2016 worksheet for MB1000 P21 vibration survey at Dongjin Semichem Incheon with Hitachi SU8010: schedule lines, overview, VC-Class summary (floor vs isolation platform top), VC-CLASS Z/X/Y environment graphs, and built-in program Z/X/Y transmissibility. A narrow decorative Word banner before the title (408×83) is omitted; the equipment photograph under the title block is included.

DVIA-M type (MB1000) installation test report — 2016-05-27
MB1000 internal worksheet dated 25–27 May 2016 (DAEIL SYSTEMS • LIM JONG UK): VC-Class Active summary on floor versus above DVIA passive/active, explanatory bullets, nine published figures — internal-program transmissibility Z/X/Y, PULSE 1/3-octave Z/X/Y, and microscope image-check rows FLOOR / PASSIVE / ACTIVE from the worksheet’s Result 3 table (header-only decoration from the DOCX omitted). No separate Overview, vibration-specification prose, Measurement Summary grid beyond the excerpted summary table, or Reference VC artwork in this handout.

DVIA-T56 (T56_150kg) Measurement Report
DVIA-T type (T56_150kg) measurement report dated 2016-05-27 (installation and measurement 2016-05-23). Includes an installation results summary with VC-class notes for floor vs ACTIVE top-of-isolator levels, Result 1 internal-program transmissibility plots (ACTIVE/PASSIVE, dB and multiple), Result 2 PULSE 1/3 octave band plots, and the standard VC criteria reference table.

China business trip report — MB1000 P17 setup, T56 service, and T78 / Newport measurements (May 2016)
Worksheet dated 2016.05.27 by Choi Hyung-moon and Lim Jong-wook covering 16.05.23–16.05.26: Shanghai Optics T56_150kg support, MB1000_P17 setup with WOJIN group for a ZEISS EVO 18 SEM including vibration-environment plots, T56 performance follow-up, and University of Science and Technology visits for DVIA-T78 versus S-2000A and Newport optical table measurements.

ZEISS EVO 18 SEM DVIA-MB1000 Installation
ZEISS EVO 18 SEM DVIA-MB1000 Installation