Installation Report
DVIA-M Series
03-20-2017

Beijing FEI SCIOS DVIA-MB1000 (P41) China business-trip setup — National Information Security Center — 2017.03.20

DVIA-M Series
Installation Report
DVIA-MB1000
P41
FEI
SCIOS
Beijing
China
National Information Security Center

China business trip report (MB1000_P41 Set up)

On-site photograph

Target equipment

FEI SCIOS

Installation site

Beijing, China

Remark

Installed at a national research institute located on the first floor.

Due to strict security, information gathering was difficult.

Top plate replaced with an aluminum plate (1300×1000).

Due to strict security, vibration measurement was not possible; only setup and internal-program performance were verified.

END USER

National Information Security Center

Date of business trip

Date of business trip: 17.03.09~17.03.11

Traveler

Traveler: Lim Jongwook

Report written date

Report written date: 17.03.20

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date03-20-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
P41
FEI
SCIOS
Beijing
China
National Information Security Center