Installation Report
DVIA-M Series
03-20-2017
Beijing FEI SCIOS DVIA-MB1000 (P41) China business-trip setup — National Information Security Center — 2017.03.20
DVIA-M Series
Installation Report
DVIA-MB1000
P41
FEI
SCIOS
Beijing
China
National Information Security Center
Contents
China business trip report (MB1000_P41 Set up)
On-site photograph
Target equipment
FEI SCIOS
Installation site
Beijing, China
Remark
Installed at a national research institute located on the first floor.
Due to strict security, information gathering was difficult.
Top plate replaced with an aluminum plate (1300×1000).
Due to strict security, vibration measurement was not possible; only setup and internal-program performance were verified.
END USER
National Information Security Center
Date of business trip
Date of business trip: 17.03.09~17.03.11
Traveler
Traveler: Lim Jongwook
Report written date
Report written date: 17.03.20
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-20-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
P41
FEI
SCIOS
Beijing
China
National Information Security Center
Related Case Studies

DVIA-M Series
Beijing University of Aeronautics and Astronautics FEI Scios2 DVIA-MB1000 (190925R1 · P143) Remote measurement — Internal program plots — 2020.08.10
08-10-2020Read more

DVIA-M Series
East China Normal University FEI Helios G4 UX DVIA-MB1000 (P36) China trip installation report — 2017.04.24
04-24-2017Read more

DVIA-M Series
FEI Nova NanoSEM 450 DVIA-MB1000 (MB1000 P31) outbound setup worksheet — reported 2017.01.16
01-16-2017Read more