Skip to main content
Installation Report
DVIA-M Series
01-16-2017

FEI Nova NanoSEM 450 DVIA-MB1000 (MB1000 P31) outbound setup worksheet — reported 2017.01.16

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P31
FEI
Nova NanoSEM
NEMO
Hangzhou
Zhejiang
China
2017

China business trip report (MB1000_P31 Set up)

Target equipment

Nova NanoSEM 450 ( FEI )

On-site photograph

Trip period

출장일: 17.01.11 ~ 17.01.14

Travelers

출장자: 최형문 대리, 임종욱 주임

Report written date

작성일: 2017.01.16

Installation result summary

Test DirectionVC-ClassBaseTop
ACTIVEZCE
XEF
YEG

Omnidirectional performance is favorable.

Pre-operation SEM setup was completed; SEM operating images were agreed to be collected via NEMO afterward.

MB1000 internal program measurement results

MB1000 internal program Z axis

MB1000 internal program X axis

MB1000 internal program Y axis

Vibration environment measurement results

Vibration environment Z axis

Vibration environment X axis

Vibration environment Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date01-16-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P31
FEI
Nova NanoSEM
NEMO
Hangzhou
Zhejiang
China
2017