Installation Report
DVIA-M Series
01-16-2017
FEI Nova NanoSEM 450 DVIA-MB1000 (MB1000 P31) outbound setup worksheet — reported 2017.01.16
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P31
FEI
Nova NanoSEM
NEMO
Hangzhou
Zhejiang
China
2017
Contents
China business trip report (MB1000_P31 Set up)
Target equipment
Nova NanoSEM 450 ( FEI )
On-site photograph
Trip period
출장일: 17.01.11 ~ 17.01.14
Travelers
출장자: 최형문 대리, 임종욱 주임
Report written date
작성일: 2017.01.16
Installation result summary
| Test Direction | VC-Class | Base | Top |
|---|---|---|---|
| ACTIVE | Z | C | E |
| X | E | F | |
| Y | E | G |
Omnidirectional performance is favorable.
Pre-operation SEM setup was completed; SEM operating images were agreed to be collected via NEMO afterward.
MB1000 internal program measurement results
MB1000 internal program Z axis
MB1000 internal program X axis
MB1000 internal program Y axis
Vibration environment measurement results
Vibration environment Z axis
Vibration environment X axis
Vibration environment Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-16-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P31
FEI
Nova NanoSEM
NEMO
Hangzhou
Zhejiang
China
2017
Related Case Studies

DVIA-M Series
China business trip report — MB1000 P32 setup for Helios NanoLab G3 UC (FEI), January 2017
01-16-2017Read more

DVIA-M Series
Hangzhou China DVIA-MB1000 (170906R4) Business Trip Report — ZIESS EVO18 Special Edition — 2017.12.08
12-08-2017Read more

DVIA-M Series
China business trip report — MB1000 P43 setup and T56 NMR test (June 2017)
06-26-2017Read more