Installation Report
DVIA-M Series
01-16-2017
China business trip report — MB1000 P32 setup for Helios NanoLab G3 UC (FEI), January 2017
DVIA-M Series
Installation Report
MB1000
FEI
Helios NanoLab
China
Zhejiang University
NEMO
2017
Contents
Report title and scope
China business trip report
(MB1000_P32 Set up)
Target equipment
Target equipment : Helios NanoLab G3 UC ( FEI )
Site photograph
Trip dates, travelers, and report date
| Field | Value |
|---|---|
| Trip dates | 17.01.11 ~ 17.01.14 |
| Travelers | Deputy Choi Hyung-moon, Manager Lim Jong-wook |
| Report date | 2017.01.16 |
Installation summary
| Test Direction | VC-Class | Base | Top |
|---|---|---|---|
| ACTIVE | Z | E | G |
| X | E | F | |
| Y | E | G |
Satisfactory performance in all directions.
Setup was performed before SEM operation; images after SEM operation are to be fed back via NEMO.
MB1000 internal program performance results
2. MB1000_P31 - Helios NanoLab G3 UC ( FEI )
Z axis
X axis
Y axis
Vibration environment measurement results
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-16-2017
Tags
DVIA-M Series
Installation Report
MB1000
FEI
Helios NanoLab
China
Zhejiang University
NEMO
2017
Related Case Studies

DVIA-M Series
FEI Nova NanoSEM 450 DVIA-MB1000 (MB1000 P31) outbound setup worksheet — reported 2017.01.16
01-16-2017Read more

DVIA-M Series
China business trip report — MB1000 P43 setup and T56 NMR test (June 2017)
06-26-2017Read more

DVIA-M Series
FEI Teneo LoVac DVIA-MB1000 (MB1000 P33) China trip report — 2017.01.16
01-16-2017Read more