Skip to main content
Installation Report
DVIA-M Series
01-16-2017

FEI Teneo LoVac DVIA-MB1000 (MB1000 P33) China trip report — 2017.01.16

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P33
FEI
Teneo LoVac
SEM
China

중국 출장 보고서 (MB1000_P33 Set up)

Target equipment

타겟 장비 : Teneo LoVac ( FEI )

Business trip

출장일: 17.01.11 ~ 17.01.14

Operator

출장자: 최형문 대리, 임종욱 주임

Report written date

작성일: 2017.01.16

Installation summary

ACTIVETest DirectionBaseTop
ACTIVEZCG
XEG
YEG

전 방향 성능 양호.

SEM가동 전 셋업을 진행하였으며, 추후 SEM가동 시 이미지는 NEMO를 통해 피드백 받기로 함.

MB1000 internal program performance measurement result

Z axis (MB1000 internal program)

X axis (MB1000 internal program)

Y axis (MB1000 internal program)

Vibration environment measurement results

Z axis (octave band)

X axis (octave band)

Y axis (octave band)

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date01-16-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P33
FEI
Teneo LoVac
SEM
China