Installation Report
DVIA-M Series
08-10-2020
Beijing University of Aeronautics and Astronautics FEI Scios2 DVIA-MB1000 (190925R1 · P143) Remote measurement — Internal program plots — 2020.08.10
DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
FEI
Scios2
Beijing
YIMO
remote
P143
Contents
(MB1000_190925R1(P143) Set up)
| Target equipment | FEI Scios2 |
|---|---|
| Place of installation | Beijing University of Aeronautics and Astronautics, 4th floor |
| Remark | Good Performance |
| END USER | Beijing University |
| Operator: Kim, Doohyun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.05. | Date of reporting : 20.08.10 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.05 (WED),
Operator: Daeil System, Manager Doohyun, Kim
Place of measurement : Beijing University of Aeronautics and Astronautics 4th floor
Equipment Model: FEI Scios2
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class | ||
|---|---|---|---|
| Z | X | Y | |
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-10-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
FEI
Scios2
Beijing
YIMO
remote
P143
Related Case Studies

DVIA-M Series
Beijing University of Aeronautics and Astronautics Thermo scientific Scios 2 DVIA-MB1000 (190925R1 · P180) Remote measurement — Internal program plots — 2020.08.12
08-12-2020Read more

DVIA-M Series
YIMO remote tuning — Inner Mongolia Univ. Hitachi SU8100 DVIA-MB1000 (201216R1-2 · P211) — 2021.06.10
06-10-2021Read more

DVIA-M Series
Tsinghua University Thermo Fisher Scientific Aquilos DVIA-MB1000 (201229R2 · P203) Remote tuning worksheet — Internal program plots — 2021.03.02
03-02-2021Read more