Installation Report
DVIA-M Series
06-10-2021
YIMO remote tuning — Inner Mongolia Univ. Hitachi SU8100 DVIA-MB1000 (201216R1-2 · P211) — 2021.06.10
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
201216R1-2
P211
Hitachi
SU8100
Inner Mongolia University
remote
Contents
(MB1000_201216R1-2(P211) Set up)
Target equipment
Hitachi SU8100
Place of installation
NeiMengGu
Remark
Good Performance
END USER
内蒙古大学
Operator
Munho Noh
Date of setup
21.06.10
Date of reporting
21.06.10
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.06.10 (THU)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement
NeiMengGu
Equipment Model
Hitachi SU8100
Measurement conditions and results
Summary of measurement results
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -24.20 dB | -33.99 dB | -30.13 dB |
| X | -27.78 dB | -35.01 dB | -39.27 dB |
| Y | -38.12 dB | -33.06 dB | -43.90 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-10-2021
Tags
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
201216R1-2
P211
Hitachi
SU8100
Inner Mongolia University
remote
Related Case Studies

DVIA-M Series
YIMO Hitachi SU8100 MB1000 P261 (211013R1) internal program handout — 2021.12.13
12-13-2021Read more

DVIA-M Series
Inner Mongolia University Hitachi S4800 DVIA-MB1000 remote VEC (201216R1-1 / P209) — 2021.06.10
06-10-2021Read more

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026Read more