Skip to main content
Installation Report
DVIA-M Series
08-12-2020

Beijing University of Aeronautics and Astronautics Thermo scientific Scios 2 DVIA-MB1000 (190925R1 · P180) Remote measurement — Internal program plots — 2020.08.12

DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
Thermo scientific
Scios 2
Beijing
YIMO
remote

(MB1000_190925R1(P180) Set up)

Target equipmentThermo scientific Scios 2
Place of installationBeijing University of Aeronautics and Astronautics
RemarkGood Performance
END USERBeijing University of Aeronautics and Astronautics
Operator: Noh, MunhoDate of business trip : 17.12.27~17.12.29
Date of setup : 20.08.12Date of reporting : 20.08.12

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.08.12 (WED),

Operator: Daeil System, Manager Munho, Noh

Place of measurement : Beijing University of Aeronautics and Astronautics

Equipment Model: Thermo scientific Scios 2

Measurement conditions and results

Summary of measurement results

Test Condition

Transmissibility

2 Hz5 Hz10 Hz
Z-24.43 dB-34.21 dB-31.10 dB
X-29.86 dB-35.33 dB-29.42 dB
Y-28.16 dB-36.84 dB-28.41 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date08-12-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
190925R1
Thermo scientific
Scios 2
Beijing
YIMO
remote