Installation Report
DVIA-M Series
12-14-2023
Thermo Fisher Scientific Scios 2 DualBeam DVIA-M1000 Installation Report (CESI, Beijing, 220321R6)
DVIA-M Series
Installation Report
DVIA-M1000
Thermo Fisher Scientific
Scios 2
China Electronics Standardization Institute
220321R6
Beijing
END USER
China Electronics Standardization Institute
M1000_ 220321R6 Set up
Set-up photograph
Target equipment
Scios 2
Place of installation
Beijing
Remark
Good Performance
Operator
Yu, Hosang
Date of setup
23.12.14
Date of reporting
24.01.04
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.12.14 (Thursday) Operator: DAEIL SYSTEMS Hosang Yu Place of measurement: Beijing Equipment Model: Thermo Fisher Scientific FIB-SEM Scios 2 DualBeam | 5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-14-2023
Tags
DVIA-M Series
Installation Report
DVIA-M1000
Thermo Fisher Scientific
Scios 2
China Electronics Standardization Institute
220321R6
Beijing
Related Case Studies

DVIA-M Series
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Installation Worksheet (210322R1) — 2021-11-08
11-08-2021Read more

DVIA-M Series
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Worksheet (MB1000 P255 · 210322R1) — 2021-11-08
11-08-2021Read more
DVIA-M Series
Chinese Academy of Sciences Institute of Semiconductors Thermo Fisher Helios 5 CX DVIA-M1000 (250619R4) Installation Report
09-01-2025Read more