Installation Report
DVIA-M Series
12-14-2023

Thermo Fisher Scientific Scios 2 DualBeam DVIA-M1000 Installation Report (CESI, Beijing, 220321R6)

DVIA-M Series
Installation Report
DVIA-M1000
Thermo Fisher Scientific
Scios 2
China Electronics Standardization Institute
220321R6
Beijing

END USER

China Electronics Standardization Institute

M1000_ 220321R6 Set up

Set-up photograph

Target equipment

Scios 2

Place of installation

Beijing

Remark

Good Performance

Operator

Yu, Hosang

Date of setup

23.12.14

Date of reporting

24.01.04

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.12.14 (Thursday) Operator: DAEIL SYSTEMS Hosang Yu Place of measurement: Beijing Equipment Model: Thermo Fisher Scientific FIB-SEM Scios 2 DualBeam | 5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-14-2023
Tags
DVIA-M Series
Installation Report
DVIA-M1000
Thermo Fisher Scientific
Scios 2
China Electronics Standardization Institute
220321R6
Beijing