Skip to main content
Installation Report
DVIA-M Series
11-08-2021

CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Worksheet (MB1000 P255 · 210322R1) — 2021-11-08

DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher Scientific
Scios 2
CETC
Shijiazhuang
210322R1

MB1000 P255 210322R1

Target equipment

Thermofisher Scios2

Place of installation

CETC 13 institute

Remark

Good Performance

END USER

Shijiazhuang

Operator

Operator: Choi, HyoungMun

Date of setup

21.11.05

Date of reporting

21.11.08

Date of business trip

17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.11.05 (FRI)

Operator: Daeil System, Research engineer Choi, HyoungMun

Place of measurement : CETC 13 institute

Equipment Model: Thermofisher Scios2

Measurement conditions and results

Summary of measurement results

Test ConditionTransmissibility
2 Hz5 Hz10 Hz
Z-25 dB-25 dB-25 dB
X-28 dB-27 dB-29 dB
Y-35 dB-30 dB-25 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date11-08-2021
Tags
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher Scientific
Scios 2
CETC
Shijiazhuang
210322R1