Installation Report
DVIA-M Series
11-08-2021
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Worksheet (MB1000 P255 · 210322R1) — 2021-11-08
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher Scientific
Scios 2
CETC
Shijiazhuang
210322R1
Contents
MB1000 P255 210322R1
Target equipment
Thermofisher Scios2
Place of installation
CETC 13 institute
Remark
Good Performance
END USER
Shijiazhuang
Operator
Operator: Choi, HyoungMun
Date of setup
21.11.05
Date of reporting
21.11.08
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.11.05 (FRI)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : CETC 13 institute
Equipment Model: Thermofisher Scios2
Measurement conditions and results
Summary of measurement results
| Test Condition | Transmissibility | ||
|---|---|---|---|
| 2 Hz | 5 Hz | 10 Hz | |
| Z | -25 dB | -25 dB | -25 dB |
| X | -28 dB | -27 dB | -29 dB |
| Y | -35 dB | -30 dB | -25 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-08-2021
Tags
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher Scientific
Scios 2
CETC
Shijiazhuang
210322R1
Related Case Studies

DVIA-M Series
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Installation Worksheet (210322R1) — 2021-11-08
11-08-2021Read more

DVIA-M Series
Thermo Fisher Scios 2 DVIA-M1000 (210322R1) Installation Report — CETC 13 institute (Shijiazhuang)
07-27-2023Read more

DVIA-M Series
Thermo Fisher Scientific Scios 2 DualBeam DVIA-M1000 Installation Report (CESI, Beijing, 220321R6)
12-14-2023Read more