Installation Report
DVIA-M Series
07-27-2023
Thermo Fisher Scios 2 DVIA-M1000 (210322R1) Installation Report — CETC 13 institute (Shijiazhuang)
DVIA-M Series
Installation Report
CETC
Shijiazhuang
Thermo Fisher
SCIOS
DVIA-M1000
210322R1
Contents
Customer and setup title
CETC 13 institute
(M1000_ 210322R1 Set up)
Target equipment and site
| Target equipment | Thermofisher Scios2 |
|---|---|
| Place of installation | Shijiazhuang |
| Remark | Good Performance |
| END USER | CETC 13 institute |
Report details
| Operator: Lee, Young Ha<br>Date of setup: 23.07.27<br>Date of reporting: 23.07.27 | Date of business trip : 17.12.27~17.12.29 |
|---|---|
| Overview The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.07.27 (Thursday) Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: Shijiazhuang Equipment Model: Thermofisher Scios2 | 5. |
M1000 internal program performance measurement result
M1000 internal program — Z axis
M1000 internal program — X axis
M1000 internal program — Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-27-2023
Tags
DVIA-M Series
Installation Report
CETC
Shijiazhuang
Thermo Fisher
SCIOS
DVIA-M1000
210322R1
Related Case Studies

DVIA-M Series
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Installation Worksheet (210322R1) — 2021-11-08
11-08-2021Read more

DVIA-M Series
CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Worksheet (MB1000 P255 · 210322R1) — 2021-11-08
11-08-2021Read more

DVIA-M Series
YIMO Zhejiang University Ningbo Institute of Technology Thermo Fisher FIB-SEM Scios 2 DVIA-M1000 (240509R7-2) Installation Report
11-06-2024Read more