Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

ZEISS Gemini FE-SEM DVIA-MB1000 Installation Report
ZEISS Gemini FE-SEM DVIA-MB1000 Installation

Hana Materials (Cheonan) KEYENCE VK-X200 DVIA-MO3000 (MO3000_P3) vibration measurement report
MO3000_P3 vibration environment worksheet dated 2017-04-28 at Hana Materials, Cheonan: KEYENCE VK-X200 target tool; floor vs isolator top-plate VC-Class summary (building floor B/C/C, isolator top F/F/G); VC-CLASS graphs and internal-program transmissibility plots for Z, X, and Y. Field engineer Im Jong-wook (DAEIL SYSTEMS). Decorative title-band bitmap from the Word header block was not published.

Hana Materials Cheonan MO3000 (P3) Vibration Environment Measurement — 28 Apr 2017
MO3000 (P3) vibration environment survey at Hana Materials, Cheonan on 28 April 2017: the vibration isolation platform top and the research-building floor were measured; results are summarized as VC classes with Z, X, and Y VC-CLASS graphs. Onboard equipment: KEYENCE VK-X200. Engineer Im Jong-wook (DAEIL SYSTEMS).

East China Normal University FEI Helios G4 UX DVIA-MB1000 (P36) China trip installation report — 2017.04.24
DVIA-MB1000 worksheet P36 from the 2017-04-24 Chinese trip report for FEI Helios G4 UX at EAST CHINA NORMAL UNIVERSITY (Shanghai, China). Trip date 17.04.18; trip personnel Lim, Jongwook. Installation result summary table and follow-up notes follow the form verbatim; MB1000 internal program and vibration-environment UI captures are published under Z, X, and Y with §2a embed mapping (image3–8). Decorative image1 and the large title-block raster following the centred report heading (image2) are omitted from the public page.

Xiamen Changelight TESCAN LYRA3 DVIA-MB1000 (P42) China trip installation report — 2017.04.24
DVIA-MB1000 worksheet P42 from the 2017-04-24 Chinese trip report for TESCAN LYRA3 at XIAMEN CHANGELIGHT COMPANY (Xiamen, China). Trip date 17.04.20; trip personnel Lim, Jongwook. Installation result summary table and follow-up notes follow the form verbatim; MB1000 internal program and vibration-environment UI captures are published under Z, X, and Y with §2a embed mapping (image3–8). Decorative image1 and the large title-block raster under the centred report title (image2) are omitted from the public page.

KPSNC Shanghai ZEISS EVO18 DVIA-MB1000 (MB1000 P22) China business trip worksheet — 2017.03.20
Korean-format China business-trip worksheet MB1000 P22 for DVIA-MB1000 with target equipment ZEISS EVO18 in Shanghai at a corporate R&D lab on the 1st floor. End user Kolbenschmidt Pierburg Shanghai Nonferrous Compenents co.,ltd (KPSNC). Trip 17.03.17, engineer Jong-wook Lim (임종욱), report dated 17.03.20. The public page includes the workshop photograph embedded after the title block (DOCX §2a, Word image2), MB1000 internal-program captures for Z/X/Y axes (image3–5), and vibration-environment graphs for Z/X/Y (image6–8). The decorative title-strip banner (Word image1, no preceding paragraph head) is not published.