Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

Helios NanoLab G3Uc DVIA-MB1000 (P142 / 190916R4) Internal program performance — 2020.08.07
DVIA-MB1000 worksheet P142 for Helios NanoLab G3Uc (measurement date 2020.08.06; reporting 2020.08.07; operator HyoungMun Choi, Daeil System). Worksheet header reads MB1000_P142 190916R4 Set up. VC-Class summary block and internal-program plots follow the worksheet; plots are ordered Z, X, then Y per DOCX §2a (rId9–11 → image2–4). The centred title-line ornament (rId8 / image1) is not republished.

Ziess-Gemini 2 DVIA-MB1000 (P172) Internal program performance — 2020.07.29
DVIA-MB1000 worksheet P172 for Ziess-Gemini 2 (measurement date 2020.07.23; setup and reporting 2020.07.29; operator HyoungMun Choi, Daeil System). Worksheet header in the DOCX reads MB1000_200522R8-8 Set up. Setup text and summary tables follow the worksheet as published; internal-program plots are ordered Z, X, then Y axis. The decorative raster on the centred title line is not republished.

MB1000 P144 (190801R7) worksheet — setup and reporting 2020-07-23
Ingested from DOCX “MB1000_P144 20.07.23.docx”. MB1000 platform 190801R7 title block; operator Choi, HyoungMun; setup and reporting both 2020-07-23; measurement the same Thursday with Daeil System. Target equipment, installation site, end user, place of measurement, and equipment model fields are blank in the handout (published as N/A). Summary-of-results table lists Floor / Above Active vs Z–X–Y without numeric cells in the source Word table; prose states good omnidirectional performance. MB1000 internal-program Z/X/Y screenshots follow DOCX §2a (rId9–11 → image2–4); raster under “NO PICTURE” (rId8 / image1) is not republished.

Covis in-house equipment DVIA-M1000 (M1000 P185) measurement — 2020-07-21
DVIA-M1000 internal-program worksheet (M1000 P185, source M1000_P185 코비스 20.07.22.docx) for Covis in-house development equipment installed at Covis (7th floor). Includes B&K LAN-XI, PCB accelerometer, and PULSE LabShop workspace figures, VC-class summary, ISO/VC reference as a markdown table (replacing duplicate reference rasters from the handout), MB1000 internal-program Z/X/Y plots, and octave-band Z/X/Y plots.

天工爱和特钢有限公司 ZEISS EVO MA25 DVIA-MB1000 (191211R2 · P158) Remote measurement — Internal program plots — 2020.07.20
YIMO-format remote worksheet for DVIA-MB1000 serial 191211R2 (project P158 from the source workbook name) with ZEISS EVO MA25. END USER and installation site 天工爱和特钢有限公司. Operator Kim Doohyun (Daeil Systems); setup, measurement, and reporting on 2020-07-20. Published figures are MB1000 internal-program Z / X / Y axis screenshots in Word order (DOCX §2a). The VC-Class summary table in the handout has blank data cells as filed. The first raster under the centred “MB1000_191211R2 Set up” line is omitted as a worksheet title graphic.

ZEISS FEI Crossbeam 550 DVIA-MB1000 P176 Internal Program Performance — Tier-1 Semiconductor — 2020.07.17
MB1000 internal-program handout for P176 with ZEISS FEI Crossbeam 550 at a Tier-1 Semiconductor fab (Icheon): setup and report dated 2020-07-16/17, measurement 2020-07-17 by Manager Choi, Hyoung Mun (DAEIL SYSTEMS). Publishes DAQ setup photos, VC-Class summary table, Z/X/Y internal-program screenshots, and octave-band plots (BASE: Floor, TOP: Above Active). Decorative title-block raster (DOCX image1) and Generic Vibration Criteria table/chart rasters (image5–6) are omitted in favor of the standard markdown VC reference table.