Installation Report
DVIA-M Series
09-18-2020
YIMO FEI Apreo C DVIA-MB1000 (P162 / 200414R1) Internal program performance — 2020.09.18
DVIA-M Series
Installation Report
DVIA-MB1000
FEI
Apreo C
Thermo Fisher
YIMO
internal program performance
P162
200414R1
NORINCO GROUP
Zhanjiang
Contents
MB1000 P162 YIMO 200414R1
| Target equipment | FEI APREO C |
|---|---|
| Place of installation | zhanjiang |
| Remark | Good Performance |
| END USER | NORINCO GROUP |
| Operator: Choim, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.09.17 | |
| Date of reporting : 20.09.18 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.09.17 (THU)
Operator: Daeil System, Research engineer Choim, HyoungMun
Place of measurement : zhanjiang
Equipment Model: FEI APREO C
Measurement conditions and results
Summary of measurement results
Test Condition
Transmissibility
| Direction | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -24 dB | -27 dB | -26 dB |
| X | -25 dB | -40 dB | dB |
| Y | -22 dB | -40 dB | dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-18-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
FEI
Apreo C
Thermo Fisher
YIMO
internal program performance
P162
200414R1
NORINCO GROUP
Zhanjiang
Related Case Studies

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021Read more

DVIA-M Series
YIMO THERMO APREO 2S DVIA-MB1000 (P237) Internal program performance — 2021.08.18
08-18-2021Read more

DVIA-M Series
YIMO DVIA-MB1000 (P160) Internal program performance — 2021.08.04
08-04-2021Read more