China University Of Geosciences (Wuhan) Apreo DVIA-M1000 (230224R2) Installation Report
DVIA-M1000 abbreviated worksheet (serial 230224R2). Setup and reporting dated 23.11.24; measurement date 2023.11.24 (Friday) in Wuhan with operator Jongwon Park from DAEIL SYSTEMS. END USER China University Of Geosciences, Wuhan; target equipment Apreo and installation site Wuhan as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics from the Word file are omitted from public copy.

Beijing Academy of Quantum Information Sciences STM DVIA-M1000 (230905R3) Installation Report
DVIA-M1000 installation report (serial 230905R3) — STM at Beijing Academy of Quantum Information Sciences, BEIJING. Short handout: overview, measurement metadata, and M1000 internal program Z/X/Y performance measurement captures. Reference uses the standard Generic Vibration Criteria markdown table only.

Omicron STM DVIA-MB1000 (230905R3) Installation Report — MB1000 internal program
DVIA-MB1000 compact installation handout (serial 230905R3) for an Omicron STM. The source lists END USER and installation/measurement locations as "-"; reporting matches setup on 23.11.23. Published captures are the MB1000 internal program Z/X/Y performance screens only; the Word source has no Reference / VC criteria appendix.

ARCHE Semilab AFM-2000 DVIA-UB350 (220621R1) Inspection Report
DVIA-UB350 (serial 220621R1) inspection report for Semilab AFM-2000 at ARCHE (147, Annyeong-gil, Byeongjeom-gu, Hwaseong-si). Tuning date 23.11.21; report 23.11.22. Idle-state and AFM-operation vibration summary tables, Z/X/Y transmissibility and VC-curve plots; Korean field notes on VC levels and suspected 60 Hz electrical noise on X during AFM. Decorative header graphic omitted; Reference uses the standard VC criteria markdown table only.

ARCHE Semilab AFM-2000 DVIA-UB350 Inspection Report
DVIA-UB350 (S/N 220621R1) active vibration isolation platform inspection report for Semilab AFM-2000 installed at ARCHE (147, Annyeong-gil, Byeongjeom-gu, Hwaseong-si, Gyeonggi-do). Z / X / Y-axis Transmissibility and VC-Curve measurements taken in idle state and with AFM in operation. All three axes achieve VC-G on the DVIA-UB350 in idle; X-axis shows suspected 60 Hz electrical noise during AFM operation.

Nanochip ZEISS GeminiSEM 300 DVIA-M1000 (220919R4-1) Installation Report
DVIA-M1000 abbreviated worksheet for serial 220919R4-1. Target equipment GeminiSEM 300 with END USER Nanochip; installation place Shanghai; setup and reporting dated 23.11.20 per the form; operator Park, Jongwon; measurement dated 2023.11.20 (Monday). Overview sentence as printed. Internal-program plots use axis labels Z axis, X axis, and Y axis under the M1000 internal program caption. Decorative bitmap embedded on the Nanochip header line was omitted from the public page.