Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1248 case studies
Sigma 300 DVIA-M1000 (230818R4) Dongguan Haoxing Setup Handout
Installation Report
DVIA-M Series
10-26-2023

Sigma 300 DVIA-M1000 (230818R4) Dongguan Haoxing Setup Handout

Short setup handout for serial 230818R4 (DVIA-M1000 wording per source) with Sigma 300 at Dongguan Haoxing Precision Electroplating Co., Ltd., Dongguan. Reporting block lists operator Park, Jongwon, setup 23.10.25, reporting 23.10.26, and a business-trip date range 17.12.27~17.12.29. Overview states the platform is appropriately installed and functioning as intended. Measurement note dated 2023.10.25 (Wednesday) with DAEIL SYSTEMS operator Jongwon Park; place of measurement Dongguan; equipment model Sigma 300. Published imagery: lab/equipment photo and M1000 internal program Z, X, and Y axis performance plots. Decorative cover/header raster omitted.

Cathay Biotech Apreo 2C HiVac DVIA-M1000 (230824R1) Installation Report

DVIA-M1000 abbreviated worksheet (serial 230824R1). Setup dated 23.09.25 and reporting dated 23.10.19; measurement date 2023.09.25 (Monday) in Shanghai with operator Sangjae Lee from DAEIL SYSTEMS. END USER Cathay Biotech Inc.; target equipment Apreo 2C HiVac and installation site Shanghai as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “M1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics and the setup bitmap under the “Set up” line are omitted from public copy.

Trina Solar sigma300 DVIA-ML1000 (230602R3) Installation Report
Installation Report
DVIA-M Series
10-17-2023

Trina Solar sigma300 DVIA-ML1000 (230602R3) Installation Report

DVIA-ML1000 handout (serial 230602R3) for sigma300 at Trina Solar, Changzhou. Published tables and overview match the form; cover/header rasters are omitted. M1000 internal program performance plots are shown for the Z, X, and Y axes. Reference uses the standard Generic Vibration Criteria markdown table only.

Hubei Youxing New Energy Sigma 300 DVIA-M1000 (230703R1) Installation Report

DVIA-M1000 installation report (serial 230703R1) for Sigma 300 at Hubei Youxing New Energy Technology Co., Ltd. Field form lists operator, setup, and reporting dates plus an Overview paragraph and M1000 internal-program performance captures for the Z, X, and Y axes. Decorative header and setup title-block rasters from the handout are not published.

Wuxi DK Electronic Materials Flex1000 DVIA-M1000 (230801R2) Internal Program Performance — 2023.10.10

DVIA-M1000 serial 230801R2 — handout for Wuxi DK Electronic Materials Co., Ltd., target equipment Flex1000, installation Shanghai. Overview and measurement details match the published form; M1000 internal program performance plots for Z, X, and Y axes from the UI program. Cover-only header graphics are not republished.

ZEISS sigma300 SEM DVIA-M1000 Internal Program Performance Report — Trina Solar (Changzhou, 2023)

Commissioning-format Trina Solar / Changzhou memo (SN 230602R3): field equipment photograph and M1000 internal-program Z/X/Y-axis measurement screenshots from the Signal program.