Installation Report
DVIA-M Series
11-24-2023
China University Of Geosciences (Wuhan) Apreo DVIA-M1000 (230224R2) Installation Report
DVIA-M Series
Installation Report
China University Of Geosciences
Wuhan
Apreo
DVIA-M1000
230224R2
Contents
China University Of Geosciences,wuhan
China University Of Geosciences,wuhan
(M1000_ 230224R2 Set up)
Site checklist
| Target equipment | Apreo |
|---|---|
| Place of installation | Wuhan |
| Remark | Good Performance |
| END USER | China University Of Geosciences,wuhan |
Operator and dates
Operator: Park, Jongwon
Date of setup: 23.11.24
Date of reporting: 23.11.24
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.11.24 (Friday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Wuhan
Equipment Model: Apreo
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-24-2023
Tags
DVIA-M Series
Installation Report
China University Of Geosciences
Wuhan
Apreo
DVIA-M1000
230224R2
Related Case Studies

DVIA-M Series
YIMO Shagang Zhangjiagang Thermo Fisher Apreo SEM DVIA-M1000 (240502R1) Installation Report
09-10-2024Read more

DVIA-M Series
Shagang Group Thermo Fisher Apreo DVIA-M1000 (230804R3) Set-up Report — Zhangjiagang
06-14-2024Read more

DVIA-M Series
Thermo Fisher Scientific Apreo 2S HiVac DVIA-M1000 Installation Report
11-09-2023Read more