DVIA-M1000 MB1000 Internal Program (231016R2), Setup 24.05.28
Installation Report
DVIA-M Series
07-05-2024

DVIA-M1000 MB1000 Internal Program (231016R2), Setup 24.05.28

MB1000 worksheet (M1000_ 231016R2 Set-up): setup 24.05.28 / reporting 24.07.05; measurement 2024.05.28. Published Vertical, Left to Right, and Front to Back internal-program screenshots from the issued form. Field entries for target equipment, end user, and site location are N/A or “-” on the source; no cover-only graphics in Storage.

DVIA-M-JT1 (231129R2-1) Installation Report
Installation Report
DVIA-M Series
07-05-2024

DVIA-M-JT1 (231129R2-1) Installation Report

DVIA-M-JT1 onboard program results (serial 231129R2-1). Operator Chaewon Lee; measurement 2024.04.30 / reporting 24.07.05. Screenshots publish Vertical, Left to Right, and Front to Back per the embedded program labels (section heading text follows the source Word template). Decorative title-block raster under (M-JT1_ … Set-up) omitted.

Northeastern University Shenyang Thermo Fisher Scientific Talos TEM DVIA-M-THT3 (231129R2-2) Installation Report

DVIA-M-THT3 internal-program worksheet (serial 231129R2-2) for a Thermo Fisher Scientific Talos TEM at Northeastern University in Shenyang, China. Setup dated 24.04.30 and reporting dated 24.07.05; measurement date 2024.04.30 (Tuesday) with operator Chaewon Lee from DAEIL SYSTEMS. The source handout has no vibration specification section, equipment condition field, tuning request capture, measurement summary table, or Reference section. Published figures are three M-THT3 internal-program plots labeled Vertical, Left to Right, and Front to Back; the Set-up title line has no accompanying raster in the source DOCX.

DVIA-M1000 (231204R3) MB1000 Set-up Internal Program Performance — Measurement 2024.01.22

DVIA-M1000 internal handout (serial 231204R3) titled MB1000_ 231204R3 Set-up with setup 24.01.22 and reporting 24.07.05. Target equipment, installation place, and END USER read as dashes on the form and are published as N/A. The Overview retains the source English sentence; measurement was on 2024.01.22 (Monday) by Byeonghun Cho from DAEIL SYSTEMS with place and equipment model N/A. The worksheet includes only M1000 internal program screenshots under Vertical, Left to Right, and Front to Back. There is no vibration specification block, measurement summary table, or Reference section in the source document.

LG Chem (Nanjing) ZEISS CrossBeam 550 DVIA-M1000 (231205R4) Installation Report

DVIA-M1000 handout archived as MB1000_231205R4_24.06.17 for LG Chem (Nanjing) and ZEISS CrossBeam 550. The public page reproduces the site header lines, bilingual summary rows, Overview line including the measurement dated 2024.06.26, the trip-record block (setup 2024.06.17 reported by Chaewon Lee vs measurement operator Byeonghun Cho), and three M1000 internal program screenshots (Vertical, Left to Right, Front to Back). No measurement summary table or Reference appendix appears in the source.

DVIA-M1000 Set-up Internal Program Report (231219R5)
Installation Report
DVIA-M Series
07-05-2024

DVIA-M1000 Set-up Internal Program Report (231219R5)

M1000_231219R5 set-up style handout listing measurement on 2024.01.25 (serial 231219R5): operator Chaewon Lee; setup dated 24.01.25; reporting dated 24.07.05. Blank source fields rendered as N/A on the web. Published screenshots only — Vertical, Left to Right, and Front to Back captions under “M1000 internal program performance measurement result”; no auxiliary cover/decoration raster in the DOCX.