Skip to main content
Installation Report
DVIA-M Series
07-05-2024

Tier-1 Semiconductor ZEISS Sigma 300 VP / JEOL IT800 SEM DVIA-M-JSA (230512R3) Internal Program Measurement Report

DVIA-M Series
Installation Report
ZEISS Sigma 300 VP
JEOL
SEM IT800
DVIA-M-JSA
230512R3
Ningbo

Ningbo SMIC

(M-JSA_ 230512R3 Set-up)

Target equipmentZEISS Sigma 300 VP
Place of installationNingbo
RemarkGood Performance
END USERNingbo SMIC

Operator: Chaewon Lee

Date of setup: 24.05.28

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M-JSA active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.05.28(Tuesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: Ningbo

Equipment Model:

Manufacturer: JEOL

Equipment: SEM

Model: IT800

M-JSA internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
ZEISS Sigma 300 VP
JEOL
SEM IT800
DVIA-M-JSA
230512R3
Ningbo