Installation Report
DVIA-M Series
07-05-2024
DVIA-MB1000 (230501R4) M1000 Internal Program Performance Installation Report
DVIA-M Series
Installation Report
DVIA-MB1000
M1000
230501R4
Contents
MB1000_ 230501R4 Set-up
| Target equipment | N/A |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
Operator: Chaewon Lee
Date of setup: 23.11.15
Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-MB1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023. 11.15(Wednesday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement:
N/A
Equipment Model:
N/A
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
M1000
230501R4
Related Case Studies

DVIA-M Series
ZEISS Sigma 300 VP DVIA-MB1000 (220121R3) Shanghai Installation Report
05-16-2026Read more

DVIA-M Series
SNU Precision DUAL BEAM DVIA-MB1000 (220216R3) Installation Report
05-16-2026Read more

DVIA-M Series
ZOLIX Shanghai Institute of Technology and Technology Three-axis Vibration Exciter DVIA-MB1000 (220330R5-3) Installation Report
05-16-2026Read more