Installation Report
DVIA-M Series
07-05-2024

DVIA-M1000 (230522R1) Internal Program Installation Report

DVIA-M Series
Installation Report
DVIA-M1000
230522R1
Internal Program

(M1000_ 230522R1 Set-up)

Site checklist

Target equipmentN/A
Place of installation-
RemarkGood Performance
END USER-

Operator and dates

Operator: Chaewon Lee

Date of setup: 23.11.14

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023. 11.14(Tuesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model:

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
DVIA-M1000
230522R1
Internal Program