Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1246 case studies
YIMO ZEISS Gemini Sigma 300VP DVIA-MB1000 (MB1000 P127) Internal Program — CHINA YIMO_TECH — 2020.04.20

YIMO-format DVIA-MB1000 worksheet referenced as MB1000 P127 (CHINA YIMO_TECH header) with ZEISS Gemini Sigma 300VP. Setup and reporting dated 2020-04-20; business-trip line 17.12.27~17.12.29. The public page includes the on-site installation photograph from the title block, the VC-Class summary grid exactly as issued (Floor and Above Active rows with empty VC-Class cells on the form), and MB1000 internal-program performance screenshots for Z, X, and Y axes.

RAITH PIONEER Two EBL and SEM DVIA-MB1000 Installation Report
Installation Report
DVIA-M Series
04-18-2020

RAITH PIONEER Two EBL and SEM DVIA-MB1000 Installation Report

RAITH PIONEER Two EBL and SEM DVIA-MB1000 Installation

YIMO TECH ZEISS EVO10 DVIA-MB1000 (P153) Internal program worksheet — 2020.04.03

YIMO-format DVIA-MB1000 internal-program worksheet (MB1000 program line P153) with target equipment ZEISS - EVO10, installation site F2, and operator Choi, Hyoung Mun (Daeil System). Setup 2020-04-03, reporting 2020-04-06; measurement date 2020.04.03 (FRI). The Summary of measurement results table lists Test Condition / VC-Class with Floor and Above Active rows; the Z/X/Y cells were blank in the source DOCX and are left empty here. MB1000 internal-program screenshots under Z axis, X axis, and Y axis follow §2a embed mapping (image2–4). The decorative bitmap on the centred “(MB1000_ P153)” title line (image1) is not republished. END USER was blank in the workbook and is published as N/A. No Vibration specification or Reference headings appear in the source; none were added.

TESCAN LYRA3 FIB-SEM DVIA-MB1000 Installation Report
Installation Report
DVIA-M Series
02-19-2020

TESCAN LYRA3 FIB-SEM DVIA-MB1000 Installation Report

TESCAN LYRA3 FIB-SEM DVIA-MB1000 Installation

Seoul National University School of Dentistry Thermo Fisher Apreo S DVIA-MB1000 (MB1000_P157 / 190816R4) Installation Report

DVIA-MB1000 field report (serial 190816R4, internal program MB1000_P157) at Seoul National University School of Dentistry with Thermo Fisher Apreo S: installation-site photo, VC-class summary table (Floor vs Above Active), MB1000 internal program captures for Z/X/Y, and octave-band plots (Floor vs Above Active). The source form does not include separate B&K PULSE VC curves, vibration-criterion curve screens, or a Reference section.

EAST UNIV FEI Quanta FEG650 DVIA-MB1000 (190702R5, P141) Installation Report — 2020.01.15

DVIA-MB1000 (serial 190702R5, project P141) at EAST UNIV F2 with FEI-QUANTA FEG650 — setup 2020-01-10, measurement 2020-01-10, report 2020-01-15. Published imagery: cover equipment context photo, MB1000 internal program Z / X / Y screens, and octave band Z / X / Y plots (BASE: Floor, TOP: Above Active).