(MB1000_P140 190916R2 Set up)
| Target equipment | FEI |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.07.07 | |
| Date of reporting : 20.07.07 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 20.07.07 (TUE),
Operator
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement
N/A
Equipment Model
Equipment Model: FEI
Measurement conditions and results
N/A
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-07-2020
Tags
DVIA-M Series
Installation Report
FEI
DVIA-MB1000
P140
MB1000 Program
190916R2
Related Case Studies

DVIA-M Series
FEI DVIA-MB1000 Program (P167 / 200522R1-2) Installation Report — 2020.07.01
07-01-2020Read more

DVIA-M Series
Guangdong Technion-Israel Institute of Technology FEI Helios 5 UC DVIA-MB1000 (200522R2-7 · P171) Remote measurement — Internal program plots — 2020.11.19
11-19-2020Read more

DVIA-M Series
Southern University of Science and Technology FEI Volumescope2 DVIA-MB1000 (191129R6 · P151) Remote measurement — Internal program plots — 2020.11.02
11-02-2020Read more