Skip to main content
Installation Report
DVIA-M Series
07-07-2020

FEI DVIA-MB1000 Program (P140 / 190916R2) Installation Report — 2020.07.07

DVIA-M Series
Installation Report
FEI
DVIA-MB1000
P140
MB1000 Program
190916R2

(MB1000_P140 190916R2 Set up)

Target equipmentFEI
Place of installationN/A
RemarkGood Performance
END USERN/A
Operator: Choi, HyoungMunDate of business trip : 17.12.27~17.12.29
Date of setup : 20.07.07
Date of reporting : 20.07.07

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 20.07.07 (TUE),

Operator

Operator: Daeil System, Manager HyoungMun, Choi

Place of measurement

N/A

Equipment Model

Equipment Model: FEI

Measurement conditions and results

N/A

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-07-2020
Tags
DVIA-M Series
Installation Report
FEI
DVIA-MB1000
P140
MB1000 Program
190916R2