Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

YIMO KYKY SEM Self made DVIA-M1000 (241209R1) Installation Report
DVIA-M1000 installation report (serial 241209R1). Published figures: tuning-request, vertical-transmissibility, left-to-right-transmissibility, front-to-back-transmissibility, equipment-picture-01. Reference uses the standard Generic Vibration Criteria markdown table.

QRT MST8500 Probe Station DVIA-T67 (250204R2) Installation Report
DVIA-T67 (serial 250204R2) inspection and vibration measurement at Korea Institute of Nano Technology 3F QRT lab on March 7, 2025, for customer QRT. Active-mode imaging noise prompted the visit; MSTech MST8500 probe station with equipment Turned on. VC / Autospectrum / Transmissibility by axis, equipment photo, measurement summary table; Reference as markdown Generic Vibration Criteria table.

National Center for Nanoscience and Technology DVIA-MO1000 (221024R3) Internal Program Performance — 2025.03.05
DVIA-MO1000 serial 221024R3 — National Center for Nanoscience and Technology handout for self-made target equipment, setup and reporting on 2025-03-05. Measurement was performed in Beijing on March 6, 2025. MO1000 internal program performance plots are published for Vertical, Left to Right, and Front to Back. Cover-only header graphics are not republished.

Fudan University JEOL F200 — DVIA-MB3000 (241017R1) Installation Report — 2025.03.04
DVIA-MB3000 active vibration isolation worksheet (serial 241017R1) for a JEOL F200 TEM at Fudan University, with measurements in Shanghai. Setup and reporting 2025.03.04; operators Chaewon Lee and Jonghwa Suh (DAEIL SYSTEMS). Published figures are MB3000 internal-program captures for Vertical, Left to Right, and Front to Back only; the Word raster under the *(MB3000_ 241017R1 Set up)* title block is omitted on the public page. No Reference / VC appendix is present in the source handout.

Fudan University JEOL STEM ARM200 DVIA-MB3000 (241021R4) Installation Report — 2025.03.04
DVIA-MB3000 (serial 241021R4) setup worksheet at Fudan University with JEOL STEM ARM200 in Shanghai: operator and reporting dates 25.03.04, measurement date 2025.03.04 (Tuesday). Includes MB3000 internal program performance plots for vertical, left-to-right, and front-to-back directions.

Fudan University JEOL STEM ARM200 DVIA-ML3000 (241021R4) Installation Report
DVIA-ML3000 installation report (serial 241021R4) at Fudan University for the JEOL STEM ARM200 in Shanghai. Tuning date March 4, 2025. Equipment condition documented as installed and turned off. The handout publishes a tuning-request capture plus vertical, left-to-right, and front-to-back transmissibility plots from the measurement UI, one on-site equipment photo, and Reference as the standard VC criteria markdown table (the reference figure is not republished).