Installation Report
DVIA-ULF Series
03-26-2025
Space-X Thermo Fisher Scientific FIB-SEM Quattro DVIA-U1000 (241204R5) Installation Report — Hawthorne, California
DVIA-U Series
Installation Report
Space-X
Thermo Fisher Scientific
Quattro
FIB-SEM
Hawthorne
California
DVIA-U1000
241204R5
Contents
Space-X
Space-X
(U1000_ 241204R5 Set up)
Site checklist
| Target equipment | Quattro |
|---|---|
| Place of installation | Hawthorne, California |
| Remark | ✓ Passive settings need to be rechecked |
| END USER | Space-X |
Operator and dates
| Operator: Sungyoon Jung Date of setup: 25.03.26 Date of reporting: 25.03.26 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The resonant frequency of the DVIA-U1000 is high, so the passive settings need to be rechecked. The performance is slightly lacking, but it is operating normally.
Measurement date: 2025.03.26 (Wednesday)
Operator: DAEIL SYSTEMS Sungyoon Jung
Place of measurement: Hawthorne, California
End User: X-Space
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: FIB-SEM
Model: Quattro
U1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date03-26-2025
Tags
DVIA-U Series
Installation Report
Space-X
Thermo Fisher Scientific
Quattro
FIB-SEM
Hawthorne
California
DVIA-U1000
241204R5
Related Case Studies

DVIA-ULF Series
Fujian Sanbao Steel Apreo 2C HiVac DVIA-U1000 (220718R9) Installation Report — Fujian
04-27-2023Read more

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026Read more

DVIA-ULF Series
Goertek Inc. ZEISS Sigma 300 DVIA-U1000 (220919R6-1) Installation Report
01-07-2026Read more