Installation Report
DVIA-ULF Series
04-27-2023
Fujian Sanbao Steel Apreo 2C HiVac DVIA-U1000 (220718R9) Installation Report — Fujian
DVIA-U Series
Installation Report
Fujian Sanbao Steel
Thermo Fisher Scientific
Apreo
HiVac
Fujian
DVIA-U1000
220718R9
Contents
Fujian Sanbao Steel Co.,Ltd.
Fujian Sanbao Steel Co.,Ltd.
(U1000_ 220718R9 Set up)
Site checklist
| Target equipment | Apreo 2C HiVac |
|---|---|
| Place of installation | FUJIAN |
| Remark | Good Performance |
| END USER | Fujian Sanbao Steel Co.,Ltd. |
Operator and dates
| Operator: Lee, Youngha Date of setup: 23.04.27Date of reporting: 22.05.02 | Date of business trip : 17.12.27~17.12.29 |
|---|
Overview
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.04.27 (Thursday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: FUJIAN, China
Equipment Model: Apreo 2C HiVac
Measurement summary (VC-Class)
| Test Condition | VC-Class |
|---|---|
| Z | |
| Floor | B |
| Above Active | D |
Good omnidirectional performance.
UB1000 internal program performance measurement result
Z axis (internal program)
X axis (internal program)
Y axis (internal program)
Octave Band Result
Z axis (octave band)
X axis (octave band)
Y axis (octave band)
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date04-27-2023
Tags
DVIA-U Series
Installation Report
Fujian Sanbao Steel
Thermo Fisher Scientific
Apreo
HiVac
Fujian
DVIA-U1000
220718R9
Related Case Studies

DVIA-ULF Series
Fujian Sanbao Steel Apreo 2C HiVac DVIA-UB700 Installation Report — Fujian
05-02-2023Read more

DVIA-ULF Series
Space-X Thermo Fisher Scientific FIB-SEM Quattro DVIA-U1000 (241204R5) Installation Report — Hawthorne, California
03-26-2025Read more

DVIA-ULF Series
FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-U1000 (220718R11) Installation Report — Fujian
03-10-2023Read more