Installation Report
DVIA-M Series
03-27-2025
DVIA-STONE-300PLUS (210824R1-2) Thermo Fisher Krios G4 — Internal Program Set-up (2025.03.27)
DVIA-M Series
Installation Report
DVIA-STONE-300PLUS
Thermo Fisher Scientific
Krios G4
210824R1-2
Peking University Huairou
Beijing
STONE-300PLUS internal program
Contents
(STONE-300PLUS_ 210824R1-2 Set up)
| Target equipment | Thermo Fisher Krios G4 |
|---|---|
| Place of installation | Beijing |
| Remark | Good Performance |
| END USER | Peking University Huairou |
Operator: Chaewon Lee
Date of setup: 25.03.27
Date of reporting: 25.03.27
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-STONE-300PLUS active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.07.19 (Friday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: Beijing
End user: Peking University Huairou
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: Cryo-TEM
Model: Krios G4
5.
STONE-300PLUS internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-27-2025
Tags
DVIA-M Series
Installation Report
DVIA-STONE-300PLUS
Thermo Fisher Scientific
Krios G4
210824R1-2
Peking University Huairou
Beijing
STONE-300PLUS internal program
Related Case Studies

DVIA-M Series
Peking University Huairou — Thermo Fisher Krios G4 Cryo-TEM DVIA-STONE-300PLUS (210824R1-2) Internal Program (2024.07.19)
07-19-2024Read more

DVIA-M Series
DVIA-STONE-300PLUS (210824R1-1) Thermo Fisher Spectra 300 TEM — Internal Program Set-up (measurement 2024.07.19)
07-19-2024Read more

DVIA-M Series
DVIA-STONE-300P (210824R1-3) Thermo Fisher Krios G4 Cryo-TEM — Peking University Huairou (Internal Program, 2024.07.19)
07-19-2024Read more