Installation Report
DVIA-M Series
07-19-2024
DVIA-STONE-300P (210824R1-3) Thermo Fisher Krios G4 Cryo-TEM — Peking University Huairou (Internal Program, 2024.07.19)
DVIA-M Series
Installation Report
DVIA-STONE-300P
Thermo Fisher Scientific
Krios G4
Cryo-TEM
210824R1-3
Peking University Huairou
Beijing
STONE-300 internal program
Contents
(STONE-300_ 210824R1-3 Set up)
| Target equipment | Thermo Fisher Krios G4 |
|---|---|
| Place of installation | 北京 |
| Remark | Good Performance |
| END USER | 北大怀柔 |
Operator: Chaewon Lee
Date of setup: 24.07.19
Date of reporting: 24.07.20
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-STONE-300P active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.07.19 (Friday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: 北京
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: Cryo-TEM
Model: Krios G4
5.
STONE-300 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-19-2024
Tags
DVIA-M Series
Installation Report
DVIA-STONE-300P
Thermo Fisher Scientific
Krios G4
Cryo-TEM
210824R1-3
Peking University Huairou
Beijing
STONE-300 internal program
Related Case Studies

DVIA-M Series
DVIA-STONE-300PLUS (210824R1-2) Thermo Fisher Krios G4 — Internal Program Set-up (2025.03.27)
03-27-2025Read more

DVIA-M Series
Peking University Huairou — Thermo Fisher Krios G4 Cryo-TEM DVIA-STONE-300PLUS (210824R1-2) Internal Program (2024.07.19)
07-19-2024Read more

DVIA-M Series
Changping P3 Laboratory Thermo Fisher Scientific Cryo-TEM Krios G4 DVIA-MB3000 (250708R5-1) Installation Report — November 5, 2025
11-05-2025Read more