Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
Filtered Case Studies

ZEISS Gemini Sigma 300 DVIA-MB1000 Installation Report (MB1000 P155, 2020-05-08)
CHINA worksheet for ZEISS Gemini Sigma 300 on DVIA-MB1000 (MB1000 P155), setup and report 2020-05-08. Published imagery: equipment photograph, then MB1000 internal-program Z / X / Y captures. Measurement summary VC-Class cells are empty in the source form.

ZEISS Gemini Sigma 300VP DVIA-MB1000 (MB1000 P147) Internal Program — CHINA — 2020.04.27
DVIA-MB1000 worksheet referenced as MB1000 P147 (CHINA header) with ZEISS Gemini Sigma 300VP at installation site 3 FLOOR. Setup and reporting dated 2020-04-27; business-trip line 17.12.27~17.12.29. The public page includes the on-site installation photograph from the title block, the VC-Class summary grid exactly as issued (Floor and Above Active rows with empty VC-Class cells on the form), and MB1000 internal-program performance screenshots for Z, X, and Y axes.

Modulesai In-House Equipment DVIA-MB1000 (P130) MB1000 Internal Program Performance — 2020.04.23
DVIA-MB1000 program MB1000 P130 demo handout for Modulesai (모듈싸이): in-house target equipment, 5F research lab site, operator Choi Hyoung Mun (Daeil System); setup 2020.04.22, reporting 2020.04.23. Published figures are MB1000 internal-program Z/X/Y, Octave Band (BASE: Floor, TOP: Above Active) Z/X/Y, and Auto Spectrum Z/X/Y from the Word export; the centered raster under the demo title line is omitted.

ZEISS Gemini Sigma 300VP DVIA-MB1000 (MB1000 P127) Internal Program — CHINA — 2020.04.20
DVIA-MB1000 worksheet referenced as MB1000 P127 (CHINA header) with ZEISS Gemini Sigma 300VP. Setup and reporting dated 2020-04-20; business-trip line 17.12.27~17.12.29. The public page includes the on-site installation photograph from the title block, the VC-Class summary grid exactly as issued (Floor and Above Active rows with empty VC-Class cells on the form), and MB1000 internal-program performance screenshots for Z, X, and Y axes.

RAITH PIONEER Two EBL and SEM DVIA-MB1000 Installation Report
RAITH PIONEER Two EBL and SEM DVIA-MB1000 Installation

ZEISS EVO10 DVIA-MB1000 (P153) Internal program worksheet — 2020.04.03
DVIA-MB1000 internal-program worksheet (MB1000 program line P153) with target equipment ZEISS - EVO10, installation site F2, and operator Choi, Hyoung Mun (Daeil System). Setup 2020-04-03, reporting 2020-04-06; measurement date 2020.04.03 (FRI). The Summary of measurement results table lists Test Condition / VC-Class with Floor and Above Active rows; the Z/X/Y cells were blank in the source DOCX and are left empty here. MB1000 internal-program screenshots under Z axis, X axis, and Y axis follow §2a embed mapping (image2–4). The decorative bitmap on the centred “(MB1000_ P153)” title line (image1) is not republished. END USER was blank in the workbook and is published as N/A. No Vibration specification or Reference headings appear in the source; none were added.