Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1266 case studies
Tongji University Raith Voyager MAX EBL DVIA-M1000 (250402R6) Installation Report

DVIA-M1000 installation report — Raith Electron Beam Lithography Voyager MAX (serial 250402R6) at Tongji University, Shanghai, China. The report includes tuning-request UI capture, transmissibility plots (vertical, left to right, front to back) via the measurement UI, and an equipment photo; it does not include a measurement summary table or VC / Autospectrum plots. Vibration specification N/A. Equipment condition: The equipment is installed/Turned off.

DGIST DVIA-MO1000 (240620R1) Installation Report
Installation Report
DVIA-M Series
08-05-2025

DGIST DVIA-MO1000 (240620R1) Installation Report

DVIA-MO1000 installation report for DGIST (serial 240620R1). Measurement summary covers equipment Turned on/IDLE in three axes with VC curves, autospectra, transmissibility, and equipment photo.

Hitachi FE-SEM SU8600 DVIA-M1000 (250102R2-2) Installation Report

DVIA-M1000 installation report (serial 250102R2-2) for Hitachi FE-SEM SU8600. Overview matches the published form. Prepared for, location, and end user fields are blank on the form and are shown as N/A. Equipment condition: The equipment is installed/Turned off. The published handout has no tuning-request figure; Data and Image publishes vertical, left-to-right, and front-to-back transmissibility plus an equipment picture. Reference uses the standard Generic Vibration Criteria markdown table only.

Tier-1 Semiconductor Giheung SR1 BRUKER Photomask Repair System RAVE NM-VI DVIA-P4000 Installation Report

Tier-1 Semiconductor Giheung SR1 BRUKER Photomask Repair System RAVE NM-VI DVIA-P4000 Installation Report

ELP Vision Inspection System DVIA-ULFB350 Installation Report
Installation Report
DVIA-ULF Series
07-30-2025

ELP Vision Inspection System DVIA-ULFB350 Installation Report

DVIA-ULFB350 (S/N 250617R4) installation report for an ELP vision inspection system in the ELP cleanroom (Building A). Vertical, left-to-right, and front-to-back VC curves, autospectra, and transmissibility with the equipment installed and turned off.

Huahong Dongfang Jingyuan SEpA_i515 DVIA-P7000 Installation Report

DVIA-P7000 installation report (serial 250131R4) at Huahong FAB 9 for Dongfang Jingyuan Electron Limited E-beam wafer inspection system (SEpA_i515). Source DVIA-P7000_250131R4 installation report.docx; tuning 2025-07-25; report written 2025-07-28. Published VC curves for vertical, left-to-right, and front-to-back axes. Word letterhead graphic (image1) omitted from public copy; Reference uses the site VC criteria table (image5.emf not published).