Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

441 case studies
Zeiss G300 DVIA-MB1000 (200319R2 · P164) Remote measurement — Internal program plots — 2020.08.17

DVIA-MB1000 serial 200319R2 (project P164) for Zeiss G300 with END USER TCL华星光电技术有限公司 (CSOT affiliate in the workbook) on the /channel-partner worksheet dated 20.08.17. Operator Munho Noh; place of installation and place of measurement lines read Shenzen exactly as in Word. Published internal-program screenshots follow the Z axis, X axis, and Y axis subtitles in workbook order after the worksheet heading line; the decorative title-band graphic under MB1000_200319R2(P164) Set up is omitted from the gallery.

Beijing University of Aeronautics and Astronautics Thermo scientific Scios 2 DVIA-MB1000 (190925R1 · P180) Remote measurement — Internal program plots — 2020.08.12

DVIA-MB1000 serial 190925R1 (project P180) for Thermo scientific Scios 2 at Beijing University of Aeronautics and Astronautics; /channel handout filename. Transmissibility summary and internal-program screenshots follow Z, X, and Y axis headings as mapped from the Word package (§2a); the image under the centered setup title line is not republished.

Hitachi High-Tech Regulus 8230 DVIA-MB1000 (200701R2 · P180) Remote measurement — Internal program plots — 2020.08.12

DVIA-MB1000 serial 200701R2 (project P180) for Hitachi High-Tech Regulus 8230 reported via /channel partner; END USER and installation site lines are blank on the form (N/A). Measurement date and reporting date 2020.08.12; internal-program Z / X / Y captures are published in Word order. The centered photo directly under the title line is treated as layout-only and is not republished.

HITACHI DVIA-MB1000 (P177 / 200522R2-6) Internal Program Performance — 2020.08.11

DVIA-MB1000 MB1000 program handout P177 (isolator serial 200522R2-6): target equipment HITACHI, setup and reporting on 2020-08-11, VC-Class summary table as in the source (numeric cells left blank in the form), Good omnidirectional performance statement, and MB1000 internal-program measurement plots for Z, X, and Y. The centered worksheet graphic under the title line is not republished.

Beijing University of Aeronautics and Astronautics FEI Scios2 DVIA-MB1000 (190925R1 · P143) Remote measurement — Internal program plots — 2020.08.10

DVIA-MB1000 serial 190925R1 (project P143) for FEI Scios2 at Beijing University of Aeronautics and Astronautics; remote worksheet. VC-Class summary table headings match the Word table; grade cells were empty in the source file. Z / X / Y internal-program captures follow §2a mapping; the centered title-block image after the setup heading is not republished.

Helios NanoLab G3Uc DVIA-MB1000 (P142 / 190916R4) Internal program performance — 2020.08.07

DVIA-MB1000 worksheet P142 for Helios NanoLab G3Uc (measurement date 2020.08.06; reporting 2020.08.07; operator HyoungMun Choi, Daeil System). Worksheet header reads MB1000_P142 190916R4 Set up. VC-Class summary block and internal-program plots follow the worksheet; plots are ordered Z, X, then Y per DOCX §2a (rId9–11 → image2–4). The centred title-line ornament (rId8 / image1) is not republished.