Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

441 case studies
Tier-1 Semiconductor ZEISS Crossbeam 550 DVIA-MB1000 (210607R3 P231) Installation Worksheet — 2021.06.16

DVIA-MB1000 (serial 210607R3, program P231) on-site worksheet dated 2021.06.16 at Tier-1 Semiconductor (Icheon, P&T Building 1) with ZEISS Crossbeam 550: B&K PULSE 14 & LAN-XI Type 3056 setup, VC-class summary table, three wide measurement plots under Measurement conditions and results, two measurement-summary visuals after the summary line, and Z/X/Y vibration criterion curve captures. Report written 2021.06.17; business trip record 2017.12.27–2017.12.29.

Stanford University JEOL JSM-IT500HR DVIA-MB1000 remote VEC (210120R5) Installation Record — 2021.06.10

Remote tuning worksheet for DVIA-MB1000 (serial 210120R5, internal program notation “P” per form header) under JEOL JSM-IT500HR at Stanford University. Operator Doohyun Kim; dates of setup and reporting match the Word table cells (business-trip window text reproduced verbatim). The source contains only an installation photograph — no VC/Narrow-band/transmissibility plots and no Reference / Generic Vibration Criteria section — so none were added.

Apple THERMO FISCHER Quanta DVIA-MB1000 remote VEC (200722R4) Installation Report — 2021.05.18

Remote VEC worksheet for DVIA-MB1000 (serial 200722R4, internal P195) under THERMO FISCHER Quanta at Cupertino, CA for Apple Inc. Operator Doohyun Kim; measurement 2021-05-14; setup and reporting dates as stated on the form; business-trip window per header. Publishes equipment photograph, MB1000 internal program axis plots, and VEC measurement axis composites from Word. The source handout has no Reference / Generic Vibration Criteria section — none was added.

ThermoFisher Talos DVIA-MB3000 (200810R1) Installation Worksheet — 2021.05.12

DVIA-MB3000 (serial 200810R1, platform P11) active-mount worksheet for ThermoFisher-Talos. Reporting date 2021.05.12; summarized transmissibility at 2 Hz, 5 Hz, and 10 Hz with omnidirectional assessment. Published plots: MB1000 internal-program performance measurement and Z/X/Y internal-program graphs; installation photograph not included on the supplied form.

Visionox (Guangzhou) Thermo Fisher Scientific Helios 5 CX DVIA-MB1000 (210524R4) Installation Report — 2021.05.12

DVIA-MB1000 worksheet (serial 210524R4) for Thermo Fisher Scientific Helios 5 CX at Visionox (Guangzhou). Operator Choi, HyoungMun; setup 21.05.10 and reporting 21.05.12; measurement date 21.06.23 (Tuesday) with Daeil System research engineer Choi, HyoungMun at Visionox (Guangzhou). The source includes a transmissibility summary table (2 Hz / 5 Hz / 10 Hz) and three MB1000 internal-program plots (Z, X, Y). Decorative header raster after the “MB1000 P232 210524R4” title line is omitted on the public page.

Shanghai University of Science and Technology TESCAN Mira DVIA-MB1000 (210309R5 · P214) Remote measurement — Internal program plots — 2021.04.30

DVIA-MB1000 serial 210309R5 (project P214) for TESCAN Mira reported by /channel partner; installation-site table lists Shanghai university floor 2 while transmissibility and internal-program screenshots were gathered in Shenzhen per the Measurement date block. Figures follow Z axis, X axis, and Y axis as in Word; ornamental title-block photo after the centered heading line is not republished.