Installation Report
DVIA-M Series
09-06-2021
YIMO Thermo Fisher Apreo 2S DVIA-MB1000 (210701R6-2 P242) Installation Report
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
Apreo 2S
DVIA-MB1000
210701R6-2
P242
Contents
MB1000 P242(210701R6-2)
Target equipment
THERMO APREO 2S
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
KIM, DOOHYUN
Date of setup
Date of setup : 21.08.20
Date of reporting
Date of reporting : 21.09.06
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.08.20 (FRI)
Operator: Daeil System, Research engineer KIM, DOOHYUN
Place of measurement
Place of measurement : THERMO APREO 2S
Equipment Model
N/A
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 5 Hz | 10 Hz | ||
|---|---|---|---|---|---|
| Z | -21 dB | -32 dB | -30 dB | ||
| X | -23 dB | -22 dB | -25 dB | ||
| Y | -29 dB | -40 dB | -25 dB | ||
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-06-2021
Tags
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
Apreo 2S
DVIA-MB1000
210701R6-2
P242
Related Case Studies

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-MB1000 (250421R8) Installation Report
11-18-2025Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher Hellos 5 UC DVIA-MB1000 (240119R4-1) Installation Report
05-11-2026Read more