Skip to main content
Installation Report
DVIA-M Series
09-06-2021

YIMO Thermo Fisher Apreo 2S DVIA-MB1000 (210701R6-2 P242) Installation Report

DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
Apreo 2S
DVIA-MB1000
210701R6-2
P242

MB1000 P242(210701R6-2)

Target equipment

THERMO APREO 2S

Place of installation

N/A

Remark

Good Performance

END USER

N/A

Operator

KIM, DOOHYUN

Date of setup

Date of setup : 21.08.20

Date of reporting

Date of reporting : 21.09.06

Date of business trip

Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 21.08.20 (FRI)

Operator: Daeil System, Research engineer KIM, DOOHYUN

Place of measurement

Place of measurement : THERMO APREO 2S

Equipment Model

N/A

Measurement conditions and results

Summary of measurement results

Test Condition2 Hz5 Hz10 Hz
Z-21 dB-32 dB-30 dB
X-23 dB-22 dB-25 dB
Y-29 dB-40 dB-25 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-06-2021
Tags
DVIA-M Series
Installation Report
YIMO
Thermo Fisher Scientific
Apreo 2S
DVIA-MB1000
210701R6-2
P242