Installation Report
DVIA-M Series
08-18-2021
YIMO THERMO APREO 2S DVIA-MB1000 (P237) Internal program performance — 2021.08.18
DVIA-M Series
Installation Report
DVIA-MB1000
THERMO Scientific
APREO 2S
YIMO
internal program performance
P237
Contents
MB1000 P237
| Target equipment | THERMO APREO 2S |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.08.18 | |
| Date of reporting : 21.08.18 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.08.18 (WED)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: THERMO APREO 2S
Measurement conditions and results
Summary of measurement results
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-18-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
THERMO Scientific
APREO 2S
YIMO
internal program performance
P237
Related Case Studies

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021Read more

DVIA-M Series
YIMO Thermo Fisher Scientific APREO 2S DVIA-MB1000 (210701R6-1 P241) Installation Report — 2021.08.24
08-24-2021Read more

DVIA-M Series
YIMO DVIA-MB1000 (P160) Internal program performance — 2021.08.04
08-04-2021Read more