Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1246 case studies
China Electric Power Research Institute Sigma500 DVIA-UB700 (220512R4) Installation Report — Beijing

DVIA-UB700 installation report prepared for CHINA ELECTRIC POWER RESEARCH INSTITUTE (serial 220512R4), Beijing site, Sigma500 equipment. Tuning date and report written date 23.01.31 per the report header; business-trip line dated 17.12.27~17.12.29. Published figures are Z / X / Y-axis transmissibility plots and one equipment photograph. The DOCX-only address-banner graphic (daeilsys site line) tied to document image1 is omitted as decorative header imagery.

NIH Dennis Winkler TESCAN Amber X DVIA-MB1000 VEC (220826R2) Installation Report — 2023.01.25

DVIA-MB1000 VEC installation worksheet (serial 220826R2) for TESCAN Amber X at NIH, Bethesda, Maryland. Prepared for Dennis Winkler; engineer Youngha Lee from DAEIL SYSTEMS; tuning January 18, 2023; dates match the Prepared by line on the form. Measurement plots derive from embedded Word PNG and EMF rasters exported for WebP upload; ornamental header raster and Generic Vibration Criteria reference graphic omitted in favor of the standard markdown criteria table.

GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report
Installation Report
DVIA-M Series
01-12-2023

GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report

DVIA-M1000 abbreviated worksheet (serial 220907R2). Setup dated 22.12.13 and reporting dated 23.01.12; measurement date 2022.12.13 (Tuesday) in HUBEI with operator Youngha Lee from DAEIL SYSTEMS. END USER GEM CO.,Ltd; target equipment Apreo 2C and installation site HUBEI as in the form. The Overview block states the standard DVIA-M1000 sentence only. No vibration specification, equipment status, tuning request, measurement summary table, or Reference section appears in the source. The internal-program section title in the source reads “MB1000 internal program performance measurement result”; published figures are three plots labeled Z axis, X axis, and Y axis. Decorative header graphics, the cover photo before the checklist, and the SET UP title-line bitmap are omitted from public copy.

Crossbeam 300 DVIA-M1000 (221212R2) Installation Report — Aucksun (HUAIAN)

DVIA-M1000 (serial 221212R2) setup summary for Crossbeam 300 at Aucksun, HUAIAN. The source handout includes target equipment and site lines, operator and trip dates, an Overview block with on-site measurement metadata (2023.01.03), and M1000 internal program Z/X/Y axis performance screenshots. Decorative header logo and facility photo before the keyfacts table are omitted; no Reference section in the source.

KIST Olympus IX51 DVIA-UD350-1008M Installation Report
Installation Report
DVIA-ULF Series
01-12-2023

KIST Olympus IX51 DVIA-UD350-1008M Installation Report

DVIA-UD350-1008M-50t-750H (S/N 221004R1) installation report at KIST (Seoul): Floor and active-platform VC curves plus transmissibility with equipment turned off.

KIST Olympus IX51 DVIA-UD350-1008M (221004R2) Installation Report
Installation Report
DVIA-ULF Series
01-12-2023

KIST Olympus IX51 DVIA-UD350-1008M (221004R2) Installation Report

DVIA-UD350-1008M-50t-750H (S/N 221004R2) installation report at KIST (Seoul): tuned January 10, 2023 by Seounghoon Cheon (DAEIL SYSTEMS), reported January 12, 2023. Olympus IX51 microscope; Data Physics Quattro / SignalCalc ACE measurement. Summary VC-class table (Floor vs Active) and nine equipment-off Floor / Top VC and Transmissibility plots (Z/X/Y). Decorative header bitmap (image1) and Reference VC diagram (image11) omitted; Reference uses the standard markdown criteria table.