Installation Report
DVIA-ULF Series
03-07-2023
FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-UB700 Installation Report (220718R11)
DVIA-U Series
Installation Report
FUJIAN ZI JIN TONG BO
Thermo Scientific
Axia
ChemiSEM
LoVac
Fujian
DVIA-UB700
220718R11
Contents
Prepared for
FUJIAN ZI JIN TONG BO
Prepared by
Engineer: Youngha Lee
Tuning date: 23.03.07
Report written date: 23.03.010
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.
System Information
Model: DVIA-U1000-910x1140 mm
Serial Number: 220718R11
Engineer
Youngha Lee, from DAEIL SYSTEMS
Tuning Date
May 07, 2023
Location
FUJIAN, China
Equipment
Axia ChemiSEM LoVac
Data and Image
Z-axis (Vertical) Transmissibility
X-axis (Left to Right) Transmissibility
Y-axis (Front to Back) Transmissibility
Equipment image
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ULF Series
Date03-07-2023
Tags
DVIA-U Series
Installation Report
FUJIAN ZI JIN TONG BO
Thermo Scientific
Axia
ChemiSEM
LoVac
Fujian
DVIA-UB700
220718R11
Related Case Studies

DVIA-ULF Series
FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-U1000 (220718R11) Installation Report — Fujian
03-10-2023Read more

DVIA-ULF Series
Fujian Sanbao Steel Apreo 2C HiVac DVIA-UB700 Installation Report — Fujian
05-02-2023Read more

DVIA-ULF Series
Sigma 300 DVIA-UB700 (221103R3) Installation Report — Shanghai Shengjian Environmental System Technology
04-06-2023Read more