Installation Report
DVIA-M Series
03-06-2023
Tier-1 Semiconductor ZEISS Crossbeam 350 DVIA-M1000 (221212R2) Installation Report — Shanghai — 2023.03.06
DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam 350
Shanghai
DVIA-M1000
221212R2
Contents
(M1000_ 221212R2 Set up)
Equipment photo
| Target equipment | Zeiss crossbeam 350 |
|---|---|
| Place of installation | SHANGHAI |
| Remark | Good Performance |
| END USER | Tier-1 Semiconductor |
| Operator: Lee, Young Ha | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 23.03.06 | |
| Date of reporting: 23.03.13 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.03.06 (Monday),
Operator
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement
SHANGHAI
Equipment Model
Zeiss crossbeam 350
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-06-2023
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam 350
Shanghai
DVIA-M1000
221212R2
Related Case Studies

DVIA-M Series
AT&S China ZEISS Crossbeam 350 DVIA-M1000 (220628R3) Installation Report
05-02-2023Read more

DVIA-M Series
ZEISS Innovation Center Sigma 360 VP DVIA-M1000 Installation Report (YIMO, Shanghai, 2025-07-03)
07-03-2025Read more

DVIA-M Series
ZEISS DEMO Laboratory Sigma 360 VP DVIA-M1000 Installation Report (Shanghai)
04-29-2025Read more