Installation Report
DVIA-M Series
03-06-2023

Tier-1 Semiconductor ZEISS Crossbeam 350 DVIA-M1000 (221212R2) Installation Report — Shanghai — 2023.03.06

DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam 350
Shanghai
DVIA-M1000
221212R2

(M1000_ 221212R2 Set up)

Equipment photo

Target equipmentZeiss crossbeam 350
Place of installationSHANGHAI
RemarkGood Performance
END USERTier-1 Semiconductor
Operator: Lee, Young HaDate of business trip : 17.12.27~17.12.29
Date of setup: 23.03.06
Date of reporting: 23.03.13

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2023.03.06 (Monday),

Operator

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement

SHANGHAI

Equipment Model

Zeiss crossbeam 350

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date03-06-2023
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam 350
Shanghai
DVIA-M1000
221212R2