Sigma 300 DVIA-M1000 (211029R3) Installation Report — BOE Technology Chengdu

DVIA-M Series
Installation Report
BOE
Chengdu
Sigma 300
DVIA-M1000
211029R3

Customer and setup title

BOE Technology Group Co., Ltd.

(M1000_ 211029R3 Set up)

Target equipment and site

Target equipmentSigma300
Place of installationCHENGDU
RemarkGood Performance
END USERBOE Technology Group Co., Ltd.

Report details

Operator: Lee, Young Ha<br>Date of setup: 23.02.20<br>Date of reporting: 23.02.24Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.02.20 (Monday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: CHENGDU
Equipment Model: Sigma300
5.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date02-24-2023
Tags
DVIA-M Series
Installation Report
BOE
Chengdu
Sigma 300
DVIA-M1000
211029R3