Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

455 case studies
MFLEX Suzhou ZEISS Sigma500 DVIA-MB1000 (190109R5) Installation worksheet — 2019.06.27

DVIA-MB1000 platform serial 190109R5 at MFLEX Suzhou MFC3 (ZEISS Sigma500). Setup 2019-06-25, reporting 2019-06-27 per the Word worksheet; VC-class summary table, MB1000 internal-program Z/X/Y plots, and octave-band Z/X/Y plots (floor vs above active) are published from DOCX §2a mapping. The black title-strip raster (image1) is omitted as decorative; the MFLEX Suzhou exterior photograph follows the setup heading.

Nissan Chemical Helios G4 UC DVIA-MB1000 Installation Report (SN 190531R3, 2019-06-27)

Helios G4 UC on DVIA-MB1000 serial 190531R3 at Nissan Chemical F1 — measurement 2019-06-24, report 2019-06-27. Published imagery: equipment photograph, MB1000 internal program Z / X / Y plots, and octave band (Floor vs Above Active) plots for each axis.

Nissan Chemical Helios G4 UC DVIA-MB1000 Installation Report — MB1000 P124 (2019-06-27)

China trip report for MB1000 project P124 at Nissan Chemical F1 with Thermo Fisher Scientific Helios G4 UC. Trip date 2019-06-24; report dated 2019-06-27. Published imagery: site/equipment photograph, MB1000 internal program Z / X / Y results, and vibration environment measurement Z / X / Y plots.

MFLEX Suzhou ZEISS Sigma500 DVIA-MB1000 (MB1000 P109) China business trip worksheet — 2019.06.27

Korean-format China business-trip worksheet MB1000 P109 for DVIA-MB1000 with target equipment ZEISS Sigma500 at MFLEX Suzhou MFC3 F4 (end user MFLEX). Business trip 19.06.25; operator line names Choi, Sungwon; report dated 19.06.27. The public page publishes the installation photograph embedded after the title block (DOCX Word image2, §2a; 1136×498), MB1000 internal-program screenshots Z / X / Y (image3–5), and vibration-environment plots Z / X / Y (image6–8). The narrow decorative title-strip bitmap Word image1 (471×214) is omitted.

Thermofisher Scientific Helios G4 UC DualBeam HR-S/TEM DVIA-MB1000 Installation Report

Thermofisher Scientific Helios G4 UC DualBeam HR-S/TEM

BOE ZEISS Gemini 2 Crossbeam 550 DVIA-MB1000 (MB1000 P112) Internal program worksheet — 2019.05.24

DVIA-MB1000 worksheet (MB1000 P112) for BOE with target equipment ZEISS-Gemini2 Crossbeam550 at BOE, 3th FLOOR. Date of business trip 19.05.22; business traveler Choi, HyoungMun; workbook Date Created 19.05.24. Measurement date 19.05.22 (WED) with Rater Daeil System, Manager Choi , Hyoung Moon. The VC-Class summary grid and narrative lines follow the DOCX text extract. Published screenshots use DOCX §2a head↔embed mapping: on-site image under the title head (image1), MB1000 internal-program Z / X / Y (image2–4), and Octave Band Result Z / X / Y for BASE Floor vs TOP Above Active (image5–7). The source has no Vibration specification or Reference section; none was added.