Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
Filtered Case Studies

TESCAN LYRA3 FIB-SEM DVIA-MB1000 Installation Report
TESCAN LYRA3 FIB-SEM DVIA-MB1000 Installation

Seoul National University School of Dentistry Thermo Fisher Apreo S DVIA-MB1000 (MB1000_P157 / 190816R4) Installation Report
DVIA-MB1000 field report (serial 190816R4, internal program MB1000_P157) at Seoul National University School of Dentistry with Thermo Fisher Apreo S: installation-site photo, VC-class summary table (Floor vs Above Active), MB1000 internal program captures for Z/X/Y, and octave-band plots (Floor vs Above Active). The source form does not include separate B&K PULSE VC curves, vibration-criterion curve screens, or a Reference section.

EAST UNIV FEI Quanta FEG650 DVIA-MB1000 (190702R5, P141) Installation Report — 2020.01.15
DVIA-MB1000 (serial 190702R5, project P141) at EAST UNIV F2 with FEI-QUANTA FEG650 — setup 2020-01-10, measurement 2020-01-10, report 2020-01-15. Published imagery: cover equipment context photo, MB1000 internal program Z / X / Y screens, and octave band Z / X / Y plots (BASE: Floor, TOP: Above Active).

SYE Hitachi SU3500 DVIA-MB1000 (MB1000_P135 / 190816R1) Installation Report
DVIA-MB1000 field report (serial 190816R1, internal program MB1000_P135) at SYE with Hitachi SU3500: installation-site photo, VC-class summary table (Floor vs Above Active; criterion cells not filled on the source form), MB1000 internal program captures for Z/X/Y, and octave-band plots (Floor vs Above Active). The source form does not include separate B&K PULSE VC curves, vibration-criterion curve screens, or a Reference section.

Northwest Polytech University ZEISS GeminiSEM 300 DVIA-MB1000 Installation Report (190123R1, 2019-12-16)
MB1000 workbook (isolator worksheet MB1000_190123R1) for ZEISS GeminiSEM 300 at Northwest Polytech University — 1F SEM&TEM room, Qixiang Building; setup 19.12.12, measurement 2019.12.12 (Thursday), report 19.12.16; Operator Choi, Sung Won (DAEIL SYSTEMS). VC-Class summary table, MB1000 internal-program Z/X/Y captures, Octave Band Result (Floor vs Above Active) Z/X/Y in document-insertion order per DOCX embed mapping (see case upload notes). Raster on the centred university masthead/title band is omitted from the public gallery.

Hugong Heavy Machinery (沪工重机) ZEISS-EVO18 DVIA-MB1000 (MB1000 P125 / 190531R4) worksheet — 2019.12.09
DVIA-MB1000 worksheet (program line MB1000 P125, isolator serial 190531R4) with target equipment ZEISS-EVO18 at F1, Hugong Heavy Machinery (沪工重机). Operator Choi, Hyoung Mun; setup 2019-12-04; reporting 2019-12-09. Measurement on 2019-12-04 at F1, FIBERHOME R&D CENTER by Daeil System, Manager Choi, Hyoung Mun. Published plots follow DOCX §2a embed mapping: MB1000 internal-program Z, X, and Y (image2–image4) and Octave Band Result (BASE: Floor, TOP: Above Active) Z, X, and Y (image5–image7). Decorative bitmap under “(MB1000_190531R4 Set up)” (image1) is not republished. The source has no Vibration specification, Reference, or Generic Vibration Criteria heading; none were added.