Installation Report
DVIA-M Series
06-19-2020
ZEISS Crossbeam 550 DVIA-MB1000 (MB1000 P145 / 191022R1) Internal Program — Singapore IME — 2020.06.19
DVIA-M Series
Installation Report
Singapore IME
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000
P145
Nanoserv
Contents
MB1000_191022R1 Set up
Installation photograph
| Target equipment | Zeiss Crossbeam 550 |
|---|---|
| Place of installation | Singapore IME Level 1 |
| Remark | Good Performance |
| END USER | Singapore IME |
| Operator: Kim, Doohyun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.06.19 | Date of reporting : 20.06.23 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.06.19 (FRI),
Operator: Daeil System, Manager Doohyun, Kim
Place of measurement : N/A
Equipment Model: Zeiss Crossbeam 550
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-19-2020
Tags
DVIA-M Series
Installation Report
Singapore IME
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000
P145
Nanoserv
Related Case Studies

DVIA-M Series
ZEISS Crossbeam 550 DVIA-MB1000 (221012R4) Installation Report
05-16-2026Read more

DVIA-M Series
ZEISS Korea Innovation Center DVIA-MB1000 (231128R4), ZEISS FIB-SEM Crossbeam 550 Installation Report
02-01-2024Read more

DVIA-M Series
Tier-1 Semiconductor Pyeongtaek P2 ZEISS Crossbeam 550 DVIA-MB1000 Installation Report (220902R5)
02-01-2023Read more