Skip to main content
Installation Report
DVIA-M Series
06-19-2020

ZEISS Crossbeam 550 DVIA-MB1000 (MB1000 P145 / 191022R1) Internal Program — Singapore IME — 2020.06.19

DVIA-M Series
Installation Report
Singapore IME
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000
P145
Nanoserv

MB1000_191022R1 Set up

Installation photograph

Target equipmentZeiss Crossbeam 550
Place of installationSingapore IME Level 1
RemarkGood Performance
END USERSingapore IME
Operator: Kim, DoohyunDate of business trip : 17.12.27~17.12.29
Date of setup : 20.06.19Date of reporting : 20.06.23

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 20.06.19 (FRI),

Operator: Daeil System, Manager Doohyun, Kim

Place of measurement : N/A

Equipment Model: Zeiss Crossbeam 550

Measurement conditions and results

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-19-2020
Tags
DVIA-M Series
Installation Report
Singapore IME
ZEISS
Crossbeam 550
DVIA-MB1000
MB1000
P145
Nanoserv