Installation Report
DVIA-M Series
06-17-2020
TESCAN AMBER DVIA-MB1000 (P161) Internal Program Performance — 2020.06.17
DVIA-M Series
Installation Report
TESCAN
AMBER
DVIA-MB1000
P161
MB1000
200306R1
Contents
(MB1000_200306R1 Set up)
| Target equipment | TESCAN - AMBER |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.06.17 | Date of reporting : 20.06.17 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 20.06.17 (WED),
Operator
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement
Place of measurement : N/A
Equipment Model
Equipment Model: TESCAN - AMBER
Measurement conditions and results
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-17-2020
Tags
DVIA-M Series
Installation Report
TESCAN
AMBER
DVIA-MB1000
P161
MB1000
200306R1
Related Case Studies
DVIA-M Series
LB Semicon TESCAN MIRA DVIA-MB1000 (MB1000 P220) Installation Report — 2021.04.16
04-16-2021Read more
DVIA-M Series
Tier-1 Semiconductor TESCAN-FE SEM DVIA-MB1000 (MB1000 program) Installation Report — 2020.06.29
06-29-2020Read more
DVIA-M Series
Tier-1 Semiconductor TESCAN-FE SEM DVIA-MB1000 (MB1000 program, P123) Installation Report — 2020.06.19
06-19-2020Read more