Installation Report
DVIA-M Series
06-17-2020

TESCAN AMBER DVIA-MB1000 (P161) Internal Program Performance — 2020.06.17

DVIA-M Series
Installation Report
TESCAN
AMBER
DVIA-MB1000
P161
MB1000
200306R1

(MB1000_200306R1 Set up)

Target equipmentTESCAN - AMBER
Place of installationN/A
RemarkGood Performance
END USERN/A
Operator: Choi, HyoungMunDate of business trip : 17.12.27~17.12.29
Date of setup : 20.06.17Date of reporting : 20.06.17

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 20.06.17 (WED),

Operator

Operator: Daeil System, Manager HyoungMun, Choi

Place of measurement

Place of measurement : N/A

Equipment Model

Equipment Model: TESCAN - AMBER

Measurement conditions and results

Measurement conditions and results

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-17-2020
Tags
DVIA-M Series
Installation Report
TESCAN
AMBER
DVIA-MB1000
P161
MB1000
200306R1