Skip to main content
Installation Report
DVIA-ML Series
06-23-2020

Hitachi Regulus a220 DVIA-ML3000 — MB1000 program P158 / 191211R2 (report 2020-06-23)

DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2

(MB1000_191211R2 Set up)

Target equipmentHitachi Regulus a220
Place of installationN/A
RemarkGood Performance
END USERN/A
Operator: Kim, DoohyunDate of business trip : 17.12.27~17.12.29
Date of setup : 20.06.19N/A
Date of reporting : 20.06.23N/A

Equipment picture

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 20.06.19 (FRI),

Operator

Operator: Daeil System, Manager Doohyun, Kim

Place of measurement

N/A

Equipment Model

Equipment Model: Hitachi Regulus a220

Measurement conditions and results

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
Floor
Above Active

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ML Series
Date06-23-2020
Tags
DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2