Installation Report
DVIA-ML Series
06-23-2020
Hitachi Regulus a220 DVIA-ML3000 — MB1000 program P158 / 191211R2 (report 2020-06-23)
DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2
Contents
(MB1000_191211R2 Set up)
| Target equipment | Hitachi Regulus a220 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Kim, Doohyun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.06.19 | N/A |
| Date of reporting : 20.06.23 | N/A |
Equipment picture
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 20.06.19 (FRI),
Operator
Operator: Daeil System, Manager Doohyun, Kim
Place of measurement
N/A
Equipment Model
Equipment Model: Hitachi Regulus a220
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-ML Series
Date06-23-2020
Tags
DVIA-ML Series
Installation Report
Hitachi
DVIA-ML3000
MB1000
P158
191211R2
Related Case Studies

DVIA-ML Series
Guangzhou GRG Thermo Fisher Talos TEM DVIA-ML3000 (260128R4) Installation Report
04-22-2026Read more
DVIA-ML Series
Tier-1 Semiconductor Hwaseong ZEISS Xradia 730 Versa DVIA-ML3000 (251107R2) Installation Report
04-03-2026Read more

DVIA-ML Series
Gränges Aluminum Thermo Fisher Spectra 200 Cryo-STEM DVIA-ML3000 (250211R4-1) Installation Report
03-06-2026Read more