Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

MC1000 (P58) vibration setup report — in-house TEM at KBSI (2018-07-30)
MC1000 (P58) active isolation setup follow-up at Korea Basic Science Institute: VC-Class summary, MB1000 internal-program Z/X/Y captures, and octave-band floor vs isolator-top plots from the 2018-07-27 site measurement (seven figures; pre-title decorative raster omitted).

Shanghai Institute of Material Research ZEISS Gemini 500 DVIA-MB1000 (171201R1) Installation Report — 2018.07.02
DVIA-MB1000 serial 171201R1 MB1000 worksheet for ZEISS-Gemini500 at Shanghai Institute of Material Research (Room 111). Operator Sung Won Choi (DAEIL SYSTEMS); setup 2018-06-29; report 2018-07-02. Publishes VC-Class summary, MB1000 internal-program Z/X/Y screenshots, and octave-band (BASE: Floor, TOP: Above Active) Z/X/Y plots; the decorative title-block graphic under the setup heading is not republished. The issued form has no Reference or Vibration specification section.

Fudan University configuration report — DVIA MC1000 / MC3000 / MB1000 active-mount vibration checks (2018-06-13–14)
Multi-unit configuration report for Fudan University (report date 2018-06-18; measurement 2018-06-13–14). Ten isolator–tool pairs on B1 (and one on 1F): MC3000, MC1000, and MB1000 units with FEI/Bruker/Oxford/Hitachi equipment. Published imagery: on-site equipment photo, transmissibility (Z/X/Y), and 1/3 octave-band graphs per unit (70 figures). Reference uses the standard VC criteria markdown table only.

East China University of Science and Technology ZEISS Gemini500 DVIA-MB1000 (MB1000 P63) Internal program worksheet — 2018.05.14
DVIA-MB1000 MB1000 program worksheet for MB1000 P63 with target equipment ZEISS-Gemini500 at East China University of Science and Technology. Operator Choi, Sung Won (Daeil System); setup 2018-05-09 and reporting 2018-05-14; measurement 2018-05-09 (Wednesday) by Manager Sung Won Choi on the 1th floor site wording as issued. Publishes the installation photograph after the title block, the VC-Class summary table (Floor D/E/E, Above Active G/G/G), MB1000 internal-program plots per axis, and octave-band (BASE: Floor, TOP: Above Active) plots per axis. Decorative centred title-banner raster (DOCX image1) is omitted.

Little Swan UB1000 P6 China Business Trip Report — Zeiss EVO 18 SEM (2018-05-10)
UB1000_P6 setup business trip report for Zeiss EVO 18 SEM at Little Swan. Trip date 2018.05.10; report written 2018.05.14; engineer CHOI SUNG WON. VC-Class summary table (ACTIVE Base Z C / Top E; X and Y E/E), installation results narrative, internal-program Z/X/Y ACTIVE transmissibility plots, and floor vibration-environment Z/X/Y 1/3-octave plots. Decorative header PNG omitted.

East China University of Science and Technology ZEISS Gemini 500 DVIA-MB1000 (P63) China trip report — 2018.05.14
MB1000 program P63 outbound worksheet for ZEISS Gemini 500 at East China University of Science and Technology (Shanghai, China): trip 2017-05-09, report lines 2017-05-14 and 2018-05-14, trip reporter 최성원. Publishes the VC-Class summary grid as issued (figure from DOCX image2), MB1000 internal-program Z/X/Y captures (image3–5), and vibration-environment measurement Z/X/Y plots (image6–8). The first DOCX embed (408×83 title strip, image1) is not republished.