YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
DVIA-MB1000 serial 210903R3 — YIMO job reference P252, target equipment Zeiss-EVO10, onsite work 2021-11-10 with report date 2021-11-11. Internal-program plots follow Z axis, X axis, and Y axis headings as in the source. The title-block raster mapped to "MB1000 P252 210903R3" in Word is not republished.

CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Installation Worksheet (210322R1) — 2021-11-08
MB1000-format worksheet headed MB1000 P255 210322R1 for Thermofisher Scios2 at CETC 13 institute (END USER Shijiazhuang). Setup 2021-11-05, reporting 2021-11-08; operator Choi HyoungMun (Daeil Systems). Publishes the worksheet capture under the header row, text transmissibility summary at 2 / 5 / 10 Hz, and MB1000 internal-program Z / X / Y screenshots.

ZOLIX DVIA-M1000 MB1000 (210610R1) Installation Report — 2021.11.08
DVIA-M1000 MB1000 worksheet (serial 210610R1, project line P254). After active mounting, floor transmissibility was summarised at 2, 5, and 10 Hz; internal-program Z / X / Y plots are published from the embedded captures. Target equipment, installation site, and end-user cells are blank on the form and are shown as N/A. Title-block photograph included under the worksheet heading.

CETC 13 Institute Thermofisher Scios2 DVIA-M1000 Worksheet (MB1000 P255 · 210322R1) — 2021-11-08
MB1000-format worksheet headed MB1000 P255 210322R1 for Thermofisher Scios2 at CETC 13 institute (END USER Shijiazhuang). Setup 2021-11-05, reporting 2021-11-08; operator Choi HyoungMun (Daeil Systems). Publishes the worksheet capture under the header row, text transmissibility summary at 2 / 5 / 10 Hz, and MB1000 internal-program Z / X / Y screenshots.

ZOLIX DVIA-M1000 MB1000 P254 (210610R1) Installation Report — 2021.11.08
DVIA-M1000 MB1000 worksheet (serial 210610R1, project line P254). After active mounting, floor transmissibility was summarised at 2, 5, and 10 Hz; internal-program Z / X / Y plots are published from the embedded captures. Target equipment, installation site, and end-user cells are blank on the form and are shown as N/A. Title-block photograph included under the worksheet heading.

BOE ZEISS CROSSBEAN350 DVIA-MB1000 (210705R1) Internal Program Performance — 2021.11.05
DVIA-MB1000 serial 210705R1 internal-program worksheet for BOE with target equipment ZEISS CROSSBEAN350. Setup 2021-11-04, reporting 2021-11-05; operator Choi HyoungMun (DAEIL SYSTEMS research engineer). Includes transmissibility summary table at 2 / 5 / 10 Hz and Z / X / Y internal-program plots under the axis captions from the source.