Skip to main content
Installation Report
DVIA-M Series
01-24-2022

Xiamen Farad Electronics Thermo Fisher Apreo 2S DVIA-M1000 MB1000 Worksheet (211206R2) — 2022-01-24

DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher
Apreo 2S
YIMO
Xiamen Farad Electronics
CABOT

MB1000 P275(211206R2)

MB1000 setup

Target equipment

Thermo Fisher Apreo 2S

Place of installation

CABOT

Remark

Good Performance

END USER

厦门法拉电子

Operator

Operator: Yu, Hosang

Date of setup

Date of setup : 22.01.19

Date of reporting

Date of reporting : 22.01.24

Date of business trip

Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 22.01.19 (WED)

Operator: Daeil System, Research engineer Yu, Hosang

Place of measurement : CABOT, 厦门法拉电子

Equipment Model: Thermo Fisher Apreo 2S

Measurement conditions and results

Summary of measurement results

Test Condition

Transmissibility

2 Hz5 Hz10 Hz
Z-28 dB-23 dB-23 dB
X-37 dB-30 dB-36dB
Y-27dB-31 dB-28 dB

Good omnidirectional performance.

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date01-24-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
MB1000
Thermo Fisher
Apreo 2S
YIMO
Xiamen Farad Electronics
CABOT