Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

All Case Studies

1246 case studies
JINSHA SITE MUSEUM Chengdu ZEISS EVO18 DVIA-U1000 (160628R6) Installation Report

DVIA-U1000 compact installation worksheet (serial 160628R6) for ZEISS EVO18 at JINSHA SITE MUSEUM, Chengdu, China. Setup 22.10.24 with reporting 22.10.25; measurement 2022.10.24 (Monday); business trip 17.12.27~17.12.29. Published setup photo and U1000 internal-program Z/X/Y measurement screens; decorative Word header ribbon (image1) omitted.

JINSHA SITE MUSEUM Chengdu ZEISS EVO18 DVIA-UB700 (160628R6) Installation Report

DVIA-UB700 active isolation platform (serial 160628R6) installation report for ZEISS EVO18 at JINSHA SITE MUSEUM, Chengdu, China. Tuning 2022-10-24, report written 2022-10-25; business-trip line 17.12.27~17.12.29. Publication includes Z / X / Y-axis transmissibility plots and equipment photograph. Decorative header bitmap (image1) omitted from the public page.

Shanghai Jiao Tong University DVIA-M1000 (211020R6-1) Internal Program Performance — 2022.10.25

DVIA-M1000 serial 211020R6-1 SJTU measurement handout dated 2022.10: overview and measurement metadata follow the institute template; onboard equipment remained TBD. The DVIA‑M isolation platform commissioning photo and M1000 internal program performance screenshots for Z, X, and Y are published. Compact header/logo graphics accompanying the masthead paragraph are omitted.

Shanghai Jiao Tong University DVIA-M1000 (211020R6-3) Internal Program Performance — Shanghai — 2022.10.25

DVIA-M1000 serial 211020R6-3 — Shanghai Jiao Tong University, worksheet target equipment TBD, measurement in Shanghai. Internal-program plots follow Z, X, and Y axis headings as in the source. Decorative header graphic behind the university line and the standalone photograph before the setup tables are not republished.

Shanghai Synchrotron Radiation Facility DVIA-M1000 (211026R3-2) Set Up Report

Abbreviated DVIA-M1000 Set Up worksheet (serial 211026R3-2) for the Shanghai Synchrotron Radiation Facility. Target equipment is TBD on the form; installation site Shanghai; reporting 22.10.25 with measurement on 2022.10.19. Overview states the DVIA-M1000 platform is appropriately installed and functioning as intended. Published figures are three M1000 internal program captures for the Z, X, and Y axes.

Shanghai Aladdin Biochemical Regulus8100 DVIA-M1000 setup report — Shanghai (DVIA-M1000, SN 211220R1)

Regulus8100 on DVIA-M1000 SN 211220R1 — Shanghai onsite performance check (2022-10-17). Z / X / Y captures from the M1000 internal program.