Installation Report
DVIA-M Series
11-29-2022
Hitachi SU8600 SEM DVIA-M1000 Internal Program Performance Report — ZEEKR (Shenzhen, 2022)
DVIA-M Series
Installation Report
DVIA-M1000
Hitachi
SU8600
SEM
ZEEKR
Shenzhen
Contents
ZEEKR
(M1000_ 220630R2 Set up)
Equipment installation
| Target equipment | SU8600 |
|---|---|
| Place of installation | SHENZHEN |
| Remark | Good Performance |
| END USER | ZEEKR |
Operator: Yu, Ho Sang Date of setup: 22.11.28 Date of reporting: 22.11.29
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.11.28 (Monday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: SHENZHEN Equipment Model: SU8600
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-29-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
Hitachi
SU8600
SEM
ZEEKR
Shenzhen
Related Case Studies

DVIA-M Series
YIMO Hitachi FE-SEM SU8600 DVIA-M1000 (240927R2-2) Installation Report
08-19-2025Read more

DVIA-M Series
YIMO Hitachi FE-SEM SU8600 DVIA-M1000 (250102R2-2) Installation Report
08-05-2025Read more

DVIA-M Series
YIMO Tongji University School of Medicine Hitachi FE-SEM SU8600 DVIA-M1000 (240709R5) Installation Report
01-08-2025Read more