Installation Report
DVIA-M Series
12-08-2022
Baosteel Shanghai DVIA-M1000 Installation Report (SN 220329R2)
DVIA-M Series
Installation Report
Baosteel
Shanghai
China
DVIA-M1000
Contents
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.12.01 (Thursday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: SHANGHAI
Equipment Model: TBD
Target equipment
TBD
Place of installation
SHANGHAI
Remark
Good Performance
End user
BAOSTEEL
Operator
Lee, Young Ha
Date of setup
22.12.01
Date of reporting
22.12.08
Date of business trip
17.12.27~17.12.29
(M1000_ 220329R2 Set up)
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-08-2022
Tags
DVIA-M Series
Installation Report
Baosteel
Shanghai
China
DVIA-M1000
Related Case Studies

DVIA-M Series
YIMO Shanghai Pumi PrMat STM DVIA-M1000 (241101R2) Installation Report — Huasheng Lianying Vibration Damping Platform
01-23-2026Read more

DVIA-M Series
ZEISS Innovation Center Sigma 360 VP DVIA-M1000 Installation Report (YIMO, Shanghai, 2025-07-03)
07-03-2025Read more

DVIA-M Series
ZEISS DEMO Laboratory Sigma 360 VP DVIA-M1000 Installation Report (Shanghai)
04-29-2025Read more