Installation Report
DVIA-M Series
12-08-2022

Baosteel Shanghai DVIA-M1000 Installation Report (SN 220329R2)

DVIA-M Series
Installation Report
Baosteel
Shanghai
China
DVIA-M1000

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.12.01 (Thursday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: SHANGHAI

Equipment Model: TBD

Target equipment

TBD

Place of installation

SHANGHAI

Remark

Good Performance

End user

BAOSTEEL

Operator

Lee, Young Ha

Date of setup

22.12.01

Date of reporting

22.12.08

Date of business trip

17.12.27~17.12.29

(M1000_ 220329R2 Set up)

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-08-2022
Tags
DVIA-M Series
Installation Report
Baosteel
Shanghai
China
DVIA-M1000