Skip to main content

Vibration Isolation Case Studies

DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.

Series

Equipment Type

Manufacturer

Filtered Case Studies

441 case studies
Nexchip Zeiss Crossbeam 550 DVIA-MB1000 (210204R3) Internal Program Performance — Hefei — 2021.06.29

DVIA-MB1000 serial 210204R3 at Nexchip, target equipment ZEISS Crossbeam 550, measurement site Hefei. Internal-program curves follow Z, X, and Y axis captions as mapped from the DOCX (§2a). The ornamental graphic embedded under the document title band is omitted from the public gallery.

Nexchip ZEISS Crossbeam 550 DVIA-MB1000 (MB1000 P212 · 210204R3) Internal Program — 2021.06.29

DVIA-MB1000 worksheet (MB1000 P212 · platform 210204R3) for ZEISS Crossbeam 550 with end user Nexchip in Hefei. Setup 2021-06-28 and reporting 2021-06-29. The public page includes the on-site installation photograph after the title block, the transmissibility summary table, and MB1000 internal-program captures for Z, X, and Y.

Stanford University JEOL JSM-IT500HR DVIA-MB1000 VEC remote (210120R5) — 2021.06.24

DVIA-MB1000 VEC remote worksheet (serial 210120R5, internal tag P221) for JEOL JSM-IT500HR at Stanford University — setup and measurement 2021-06-10, report 2021-06-24, operator Doohyun Kim (Daeil Systems). Summary tables list transmissibility at 2/5/10 Hz and VC Class rows with blank Floor/Top Plate cells as in the source. MB1000 internal-program plots (Z/X/Y axis) are published from the Word embeds; the title graphic before the setup table and empty VEC axis placeholders are omitted.

Visionox (Guangzhou) Thermo Fisher Scientific Helios 5 CX DVIA-MB1000 (210524R4) — MB1000 P232 worksheet — 2021.06.23

Ingested from DOCX named “MB1000 P232 21.06.23”. Same MB1000 P232 (210524R4) worksheet for Thermo Fisher Scientific Helios 5 CX at Visionox (Guangzhou): operator Choi, HyoungMun; setup 21.05.10 and reporting 21.05.12; measurement 21.06.23 (Tuesday) with Daeil System research engineer Choi, HyoungMun on site. Transmissibility summary (2 Hz / 5 Hz / 10 Hz) and three MB1000 internal-program plots (Z, X, Y). Decorative raster immediately after the “MB1000 P232 210524R4” title line is not published.

Shihu Technology Nanjing SUSS MA/BA Gen4 Pro DVIA-MB1000 — Remote setup — 2021.06.18

DVIA-MB1000 setup MB1000_210316R5(P229) for Shihu Technology (Nanjing), target equipment BOND ALINGER / SUSS MA/BA Gen4 Pro — onsite vibration check after active mounting, transmissibility summary table, and internal-program Z/X/Y plots. Decorative header graphic behind the setup title is not republished.

KBSI (Ochang) MC3000 P20 / 210422R1 vibration worksheet — 2021.06.18

MC3000 serial 210422R1 (program P20) worksheet at Korea Basic Science Institute (Ochang): in-house developed equipment, measurement on 2021-06-17, report dated 2021-06-18. PULSE 14 setup, VC-Class summary table (Floor vs Above Active), wide-format measurement plots, and Z/X/Y vibration criterion curves.