Installation Report
DVIA-M Series
10-12-2021
Xiamen Haichen Zeiss Sigma300 DVIA-MB1000 (P239 · 210820R1) Installation Report — 2021.10.12
DVIA-M Series
Installation Report
DVIA-MB1000
Zeiss
Sigma300
Xiamen
YIMO
P239
210820R1
Contents
(MB1000 P239 Set up)
Equipment installation photograph
| Target equipment | Zeiss Sigma300 |
|---|---|
| Place of installation | xiamen |
| Remark | Good Performance |
| END USER | 厦门海辰 |
| Operator: Kim, Doohyun | Date of setup : 21.10.12 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.10.12 (TUE)
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement : 厦门海辰
Equipment Model: Zeiss Sigma300
Measurement conditions and results
| Test Condition (Transmissibility) | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -28 dB | -25 dB | -25 dB |
| X | -38 dB | -28 dB | -30 dB |
| Y | -35 dB | -30 dB | -30 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-12-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
Zeiss
Sigma300
Xiamen
YIMO
P239
210820R1
Related Case Studies

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
11-11-2021Read more

DVIA-M Series
TPK Holding Co., Ltd Thermo Fisher Helios G5 DVIA-MB1000 (201214R4 · P216) Remote measurement — Internal program plots — 2021.04.09
04-09-2021Read more

DVIA-M Series
Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11
01-11-2021Read more